To balances due from agents and conductors, Debit balance, To cash, To profit and loss, Total, B., H. & E. R. R. "Berdell Bonds," converted into stock, 288,000.00 By funded indebtedness incurred for purchase of Balance due Commonwealth of Massachusetts, 300,000.00 986,532.00 Balance due Piper's wharf, Co. car trust (principal), By interest unpaid, By credit balances, notes payable, 1,652,174.92 228,056.98 80,000.00 First mortgage, due January 1, 1905, rate of in terest, 7 per cent., $6,000,000.00 First mortgage, due January 1, 1905, rate of in terest, 6 per cent., 4,000,000.00 Second mortgage, due August 1, 1902, rate of in Second mortgage, due August 1, 1902, rate of in terest, 3 per cent., Interest on first mortgage paid to July 1, 1887, and on second mortgage paid to August 1, 1887. $998,000.00 DESCRIPTION OF ROAD. Date when road, or different portions thereof were opened for use, viz.:— From Boston, Mass., to Putnam, Conn, 1855; from Putnam, Conn., to Willimantic, Conn, 1872; from Willimantic, Conn., to Hartford, Conn., 1849; from Hartford, Conn., to Bristol, Conn., 1850; from Bristol, Conn, to Waterbury, Conn., 1855; from Waterbury, Conn., to Fishkill-on-Hudson, N. Y., 1881; from Providence, R. I., to Willimantic, Conn, 1854; from East Thompson, Conn., to Southbridge, Mass., 1867; from Cook Street, Mass., to Woonsocket, R. I., 1863. Length of main line from Boston to Hopewell Junction, 215.04m. Length of road (main line and branches) owned by the Company, Same in Connecticut, 325.77m. 172.32m. Length of double-track road (in main line), 108.10m. Length of track of road, including sidings, in sin gle track miles, 559.55m. Same in Connecticut, 287.10m. Length of track laid with steel rails (weight per yard, lbs.,) 429.85m. Same in Connecticut, 233.80m. Miles of track laid with steel rails during the year (No. of tons, 2,787, weight per yard, 60 and 66 lbs., cost $72,826.09); increased mileage of steel No. of tons, 4,519 new steel, cost $49,593.04, replacing old steel and iron, 28.07m. Number of new ties put in track during the year Aggregate length of stone-arch bridges, in feet, 955 gates, Same in Connecticut, Number of highway crossings at grade, with flagmen, Number of highway crossings at grade, with Same in Connecticut, Number of highway crossings at grade, with elec tric signals, Same in Connecticut, Number of railroads crossed at grade, and names of each, Same in Connecticut, Naugatuck Railroad at Waterbury; Hart- Name, termini, and length of each road operated by this Company under lease or contract: Franklin to Valley Falls, 13 13.60m. |