Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1U.S. Government Printing Office, 1949 - Harbors |
From inside the book
Results 1-5 of 100
Page 793
... navigation channels throughout the project between the Indian River and Ft . Myers , Fla .; remove obstructions from navigation channels and peri- odic and miscellaneous surveys and examinations of navigation chan- nels ...
... navigation channels throughout the project between the Indian River and Ft . Myers , Fla .; remove obstructions from navigation channels and peri- odic and miscellaneous surveys and examinations of navigation chan- nels ...
Page 905
... navigation called for by river and harbor acts and committee resolutions Locality Authorization act Date trans- mitted to Congress Document No. Recom- mendation Alabama River , waterway to Escambia River , Fla . , and Ala . Alabama ...
... navigation called for by river and harbor acts and committee resolutions Locality Authorization act Date trans- mitted to Congress Document No. Recom- mendation Alabama River , waterway to Escambia River , Fla . , and Ala . Alabama ...
Page 920
... navigation above this point is limited to small craft and rafted timber . In ordinary seasons a depth of 6 feet or ... navigation and 6.5 feet or more for heavy draft navigation on Bayou Macon . A gage reading of 20 feet or more at ...
... navigation above this point is limited to small craft and rafted timber . In ordinary seasons a depth of 6 feet or ... navigation and 6.5 feet or more for heavy draft navigation on Bayou Macon . A gage reading of 20 feet or more at ...
Page 945
... navigation . Cost ( including approaches ) - 0.13 . 75 feet . 425 feet . 0 to 19.6 feet . 12 feet . Timber piles . None . Reinforced concrete . 1934 and completed 1935 . $ 1,775,132.24 . Algiers lock 7 . Miles from New Orleans , La ...
... navigation . Cost ( including approaches ) - 0.13 . 75 feet . 425 feet . 0 to 19.6 feet . 12 feet . Timber piles . None . Reinforced concrete . 1934 and completed 1935 . $ 1,775,132.24 . Algiers lock 7 . Miles from New Orleans , La ...
Page 962
... navigation structures , Cubits Gap to the mouths of the Passes , Oct. 20 , 1934 . Do. Permanent Appropriations Repeals Act . Second interim report of board on revised plan for navigation struc- tures , Cubits Gap to the mouths of the ...
... navigation structures , Cubits Gap to the mouths of the Passes , Oct. 20 , 1934 . Do. Permanent Appropriations Repeals Act . Second interim report of board on revised plan for navigation struc- tures , Cubits Gap to the mouths of the ...
Other editions - View all
Common terms and phrases
100 feet wide 1st sess 2d sess Accounts payable anchorage Annual Report appropriated to June approved estimate available for fiscal bridge Chief of Engineers Condition at end Cong Connecticut River construction controlling depth Cost and financial Cost of maintenance costs and expenditures Creek dredging end of fiscal ending June 30 estimate for annual estimate of cost existing project expenditures to June financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Geodetic Survey Chart Harbor Act hired labor jetties Johns River July July 24 June 25 June 30 Lake Okeechobee latest published map maintenance to June mean low water miles mouth Operations and results Pamlico Sound project dimensions project was authorized results during fiscal River and Harbor summary Total amount thence tidal range Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin U. S. Coast unobligated balance available wharves width