Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1U.S. Government Printing Office, 1949 - Harbors |
From inside the book
Results 1-5 of 100
Page 32
... mean low water , which is 3 feet above extreme low tide . The mean range of tide at Bangor is 13.1 feet , and the extreme about 15 feet . The estimate of cost for new work , corrected in 1949 , was $ 292,020.53 exclusive of amounts ...
... mean low water , which is 3 feet above extreme low tide . The mean range of tide at Bangor is 13.1 feet , and the extreme about 15 feet . The estimate of cost for new work , corrected in 1949 , was $ 292,020.53 exclusive of amounts ...
Page 34
... low tide , the depths at the others varying up to 20 feet . City of Rockland has provided a public landing , with floats attached , having depths at mean low water of about 6 feet alongside . Facilities are considered adequate for ...
... low tide , the depths at the others varying up to 20 feet . City of Rockland has provided a public landing , with floats attached , having depths at mean low water of about 6 feet alongside . Facilities are considered adequate for ...
Page 47
... mean low water through sand bars in the river called " The Shoals " and " Labor in Vain " , and extending to the ... water at any of these wharves at low tide . One of them is owned by the town of Ipswich and is open to the public ...
... mean low water through sand bars in the river called " The Shoals " and " Labor in Vain " , and extending to the ... water at any of these wharves at low tide . One of them is owned by the town of Ipswich and is open to the public ...
Page 48
... mean low water . The costs have been $ 7,353.13 , of which $ 5,617.91 was for new work , and $ 1,735.22 for maintenance . The expenditures have been $ 1,322.42 . Proposed operations . - The sum of $ 677.58 unexpended at the end of ...
... mean low water . The costs have been $ 7,353.13 , of which $ 5,617.91 was for new work , and $ 1,735.22 for maintenance . The expenditures have been $ 1,322.42 . Proposed operations . - The sum of $ 677.58 unexpended at the end of ...
Page 49
... mean low water . Annisquam River . - For a channel 8 feet deep at mean low water 60 feet wide from Gloucester Harbor to the Boston & Maine Railroad bridge , 100 feet wide from the railroad bridge to the mouth of the river , and 200 feet ...
... mean low water . Annisquam River . - For a channel 8 feet deep at mean low water 60 feet wide from Gloucester Harbor to the Boston & Maine Railroad bridge , 100 feet wide from the railroad bridge to the mouth of the river , and 200 feet ...
Other editions - View all
Common terms and phrases
100 feet wide 1st sess 2d sess Accounts payable anchorage Annual Report appropriated to June approved estimate available for fiscal bridge Chief of Engineers Condition at end Cong Connecticut River construction controlling depth Cost and financial Cost of maintenance costs and expenditures Creek dredging end of fiscal ending June 30 estimate for annual estimate of cost existing project expenditures to June financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Geodetic Survey Chart Harbor Act hired labor jetties Johns River July July 24 June 25 June 30 Lake Okeechobee latest published map maintenance to June mean low water miles mouth Operations and results Pamlico Sound project dimensions project was authorized results during fiscal River and Harbor summary Total amount thence tidal range Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin U. S. Coast unobligated balance available wharves width