Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1U.S. Government Printing Office, 1949 - Harbors |
From inside the book
Results 1-5 of 100
Page 35
... depth of 5 feet , by contract , was commenced on December 2 , 1948 and completed on June 20 , 1949. During this period , 55,870 cubic yards of mud were removed at a cost of $ 90,127.09 . The expenditures were $ 78,842.71 . Condition at ...
... depth of 5 feet , by contract , was commenced on December 2 , 1948 and completed on June 20 , 1949. During this period , 55,870 cubic yards of mud were removed at a cost of $ 90,127.09 . The expenditures were $ 78,842.71 . Condition at ...
Page 36
... depth along the wharves in 1945 was 3 feet at mean low water . The total costs under the existing project have been $ 7,925.19 , of which $ 6,500 was for new work , and $ 1,425.19 was for main- tenance . The expenditures have been ...
... depth along the wharves in 1945 was 3 feet at mean low water . The total costs under the existing project have been $ 7,925.19 , of which $ 6,500 was for new work , and $ 1,425.19 was for main- tenance . The expenditures have been ...
Page 39
... depth of 14 feet between the Grand Trunk and Tukeys Bridges , and a channel 12 feet deep and 300 feet wide thence to the head of Back Cove ; for the removal of two obstructing ledges in the main ship channel to a depth of 40 feet ; for ...
... depth of 14 feet between the Grand Trunk and Tukeys Bridges , and a channel 12 feet deep and 300 feet wide thence to the head of Back Cove ; for the removal of two obstructing ledges in the main ship channel to a depth of 40 feet ; for ...
Page 40
... depth of 35 feet the present 30 - foot channel in the inner harbor and Fore River , and in dredging to a depth of 35 feet a turning basin easterly of Vaughan Bridge during fiscal year 1950 . The sum of $ 206,000 allotted in fiscal year ...
... depth of 35 feet the present 30 - foot channel in the inner harbor and Fore River , and in dredging to a depth of 35 feet a turning basin easterly of Vaughan Bridge during fiscal year 1950 . The sum of $ 206,000 allotted in fiscal year ...
Page 43
... depth in Perkins Cove to and including an anchorage basin of the same depth and about 3.2 acres in area in Flat Pond . The project depths refer to mean low water . The mean range of tide is 8.7 feet and the spring range is 10 feet . The ...
... depth in Perkins Cove to and including an anchorage basin of the same depth and about 3.2 acres in area in Flat Pond . The project depths refer to mean low water . The mean range of tide is 8.7 feet and the spring range is 10 feet . The ...
Other editions - View all
Common terms and phrases
100 feet wide 1st sess 2d sess Accounts payable anchorage Annual Report appropriated to June approved estimate available for fiscal bridge Chief of Engineers Condition at end Cong Connecticut River construction controlling depth Cost and financial Cost of maintenance costs and expenditures Creek dredging end of fiscal ending June 30 estimate for annual estimate of cost existing project expenditures to June financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Geodetic Survey Chart Harbor Act hired labor jetties Johns River July July 24 June 25 June 30 Lake Okeechobee latest published map maintenance to June mean low water miles mouth Operations and results Pamlico Sound project dimensions project was authorized results during fiscal River and Harbor summary Total amount thence tidal range Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin U. S. Coast unobligated balance available wharves width