Trinity River Division Features of the Central Valley Project, California: Design |
From inside the book
Results 1-5 of 100
Page vi
... limit control 176 ( d ) Auxiliary gate controls . ( e ) Oil - pressure system . 177 177 4. Turbine and Governor Unit Auxiliaries 110 . 111 . Generator and turbine bearing lubrication Unit cooling 177 · 178 112 . Drainage and unwatering ...
... limit control 176 ( d ) Auxiliary gate controls . ( e ) Oil - pressure system . 177 177 4. Turbine and Governor Unit Auxiliaries 110 . 111 . Generator and turbine bearing lubrication Unit cooling 177 · 178 112 . Drainage and unwatering ...
Page 15
... limits for Diversion opproach Channel Waste disposal area . E1.787,900 330,000 7030 0282 0512- 4300 2355 DH 145 Outlet works- DH 144 DH 122 1103 1971 , 80 Rapids Transmission line Spring Limit of area within which detailed surface ...
... limits for Diversion opproach Channel Waste disposal area . E1.787,900 330,000 7030 0282 0512- 4300 2355 DH 145 Outlet works- DH 144 DH 122 1103 1971 , 80 Rapids Transmission line Spring Limit of area within which detailed surface ...
Page 18
... limits of excavation area 2 and in the forest slope above it . Additional evidence for slow down- slope movement appeared along the projecting slide plane which cut laterally and downslope across the graded slopes to around elevation ...
... limits of excavation area 2 and in the forest slope above it . Additional evidence for slow down- slope movement appeared along the projecting slide plane which cut laterally and downslope across the graded slopes to around elevation ...
Page 33
... limit of the crushed zone . It strikes N. 12 ° E. to N. 38 ° E. , dips 40 ° W. , and is in a 100 - foot zone of intense crushing , contorted slip planes , and disrupted dikes . Another outstanding fault with a 7 - foot wide gouge and ...
... limit of the crushed zone . It strikes N. 12 ° E. to N. 38 ° E. , dips 40 ° W. , and is in a 100 - foot zone of intense crushing , contorted slip planes , and disrupted dikes . Another outstanding fault with a 7 - foot wide gouge and ...
Page 34
... limit hidden by alluvium ) . Thus , after crossing the Willow Creek system , the tunnel was evidently in the wedge of squeezed and shattered rock between the Willow Creek fault and the Hoadley fault . ( e ) Station 510/95 to Station ...
... limit hidden by alluvium ) . Thus , after crossing the Willow Creek system , the tunnel was evidently in the wedge of squeezed and shattered rock between the Willow Creek fault and the Hoadley fault . ( e ) Station 510/95 to Station ...
Contents
6 | |
7 | |
13 | |
15 | |
17 | |
19 | |
23 | |
25 | |
225 | |
230 | |
231 | |
236 | |
239 | |
242 | |
244 | |
248 | |
27 | |
29 | |
34 | |
39 | |
42 | |
46 | |
48 | |
52 | |
58 | |
62 | |
63 | |
70 | |
76 | |
81 | |
82 | |
85 | |
93 | |
95 | |
102 | |
108 | |
112 | |
120 | |
129 | |
130 | |
136 | |
144 | |
148 | |
150 | |
156 | |
166 | |
168 | |
174 | |
176 | |
183 | |
184 | |
190 | |
191 | |
196 | |
199 | |
200 | |
202 | |
203 | |
207 | |
215 | |
218 | |
224 | |
253 | |
254 | |
259 | |
263 | |
266 | |
269 | |
272 | |
279 | |
285 | |
287 | |
288 | |
291 | |
295 | |
301 | |
302 | |
303 | |
305 | |
312 | |
316 | |
317 | |
323 | |
331 | |
337 | |
345 | |
346 | |
347 | |
350 | |
353 | |
358 | |
364 | |
365 | |
369 | |
374 | |
377 | |
379 | |
380 | |
388 | |
397 | |
397 | |
397 | |
415 | |
485 | |
486 | |
489 | |
517 | |
Common terms and phrases
acre-feet Anchor Anchor bars auxiliary outlet backfill basin borrow area BUREAU OF RECLAMATION butterfly valve CENTRAL VALLEY PROJECT chute Clear Creek Power Conc construction Contraction joint Copley Creek Power Conduit crest cubic yards damsite DETAIL discharge diversion downstream draft tube drain excavation fault flip bucket flow fractured gate chamber gravel GREENSTONE Grout head hoist horizontal hydraulic inlet installed intake structure INTERIOR BUREAU Keswick Reservoir Lewiston liner load located material maximum meters operation outlet pipe penstock penstock header percent piezometer portal pounds per square pressure PROJECT TRINITY RIVER pump RECLAMATION CENTRAL VALLEY reinforcement relay reservoir reservoir water ring Riprap SCALE OF FEET second-feet SECTION A-A shear shown on figure slope spillway Spring Creek Powerplant square inch station stresses surge tank switch Trinity Dam TRINITY RIVER DIVISION TRINITY RIVER DIVISION-CALIFORNIA turbine UNITED STATES DEPARTMENT upstream VALLEY PROJECT TRINITY vertical weathered Weaverville Whiskeytown Zone
Popular passages
Page 179 - ... rpm When operating at pressures in excess of 100 psi, the engine speed will drop in proportion to the increase in discharge pressure; conversely, a decrease in discharge pressure will cause the engine to speed up. Engine speeds in excess of...
Page 222 - Engine driven generators will operate successfully at rated kva, frequency, and power factor at any voltage not more than 5 percent above or below rated voltage, but not necessarily in accordance with the standards of performance established for operation at normal rating except that inherently selfregulated type generators shall not be required to operate at other than rated voltage. Frequency Rating.
Page 372 - ... percent power factor, 6,900-volts, 3-phase, and 60-cycle at 600 rpm. Each generator is a vertical shaft type synchronous machine, designed for clockwise rotation when looking down on the unit. A thrust bearing and an upper guide bearing are provided above the rotor; a power guide bearing is provided below the rotor. A common oil reservoir is provided for the thrust and upper guide bearing, and there is a separate oil reservoir for the lower guide bearing. As the thrust bearing is supported by...
Page 365 - Worldwide attention to the requirements of the American Society of Mechanical Engineers...
Page 114 - ... any) and all piping conveying fuel in suspension in air exceeds 100 cubic feet all such piping shall be at least equal to the requirements of Paragraph 26, Specification No. 2, and all mixing and separating chambers shall either be constructed for a working pressure of 50 pounds per square inch with a factor of safety of 4 based on the ultimate strength of the material, or located in a separate room or floor cut off from the rest of the building and constructed in accordance with Section 13....
Page 48 - Triaxial Shear Tests on Pervious Gravelly Soils," Journal of the Soil Mechanics and Foundations Division.
Page 234 - The unit shall also be equipped with a pressure pump capable of delivering 100 gallons per minute at a pressure of 100 pounds per square inch.