Trinity River Division Features of the Central Valley Project, California: Design |
From inside the book
Results 1-5 of 100
Page
... connected to three 23 , 220/30 , 960/38 , 700/43 , 333 - kv . - a . , 13.2- to 230 - grounded wye / 132 . 8 - kilovolt , single - phase , outdoor power transformers through gen- erator voltage circuit breakers . Emin 66 Turbines : Two ...
... connected to three 23 , 220/30 , 960/38 , 700/43 , 333 - kv . - a . , 13.2- to 230 - grounded wye / 132 . 8 - kilovolt , single - phase , outdoor power transformers through gen- erator voltage circuit breakers . Emin 66 Turbines : Two ...
Page
... connected to three 35 , 000/46 , 667/58 , 333 - kv . -a . , 13.2- to 230- grounded wye / 132.8 - kilovolt , single - phase , outdoor power transformers through generator voltage circuit breakers . Turbines : Two vertical - shaft ...
... connected to three 35 , 000/46 , 667/58 , 333 - kv . -a . , 13.2- to 230- grounded wye / 132.8 - kilovolt , single - phase , outdoor power transformers through generator voltage circuit breakers . Turbines : Two vertical - shaft ...
Page
... connected to three 34 , 800/46 , 400/58 , 000/65 , 000 - kv . -a . , 13. 2- to 230 - grounded wye / 132.8 - kilovolt single - phase outdoor power transformers through gen- erator voltage circuit breakers . Turbines : Two vertical ...
... connected to three 34 , 800/46 , 400/58 , 000/65 , 000 - kv . -a . , 13. 2- to 230 - grounded wye / 132.8 - kilovolt single - phase outdoor power transformers through gen- erator voltage circuit breakers . Turbines : Two vertical ...
Page 25
... connected , supplied information on the pressure increase . There are 1,657 weep holes in the tunnel lining . The large flow of water from the inlet portal led to the conclusion that the tunnel may have influenced wells and streams in ...
... connected , supplied information on the pressure increase . There are 1,657 weep holes in the tunnel lining . The large flow of water from the inlet portal led to the conclusion that the tunnel may have influenced wells and streams in ...
Page 40
... connection with Trinity Dam and Clair Engle Lake was accomplished by separate contracts . The dam contract included only two short lengths of access road . These are the crest of dam access road connecting the dam crest with the ...
... connection with Trinity Dam and Clair Engle Lake was accomplished by separate contracts . The dam contract included only two short lengths of access road . These are the crest of dam access road connecting the dam crest with the ...
Contents
6 | |
7 | |
13 | |
15 | |
17 | |
19 | |
23 | |
25 | |
225 | |
230 | |
231 | |
236 | |
239 | |
242 | |
244 | |
248 | |
27 | |
29 | |
34 | |
39 | |
42 | |
46 | |
48 | |
52 | |
58 | |
62 | |
63 | |
70 | |
76 | |
81 | |
82 | |
85 | |
93 | |
95 | |
102 | |
108 | |
112 | |
120 | |
129 | |
130 | |
136 | |
144 | |
148 | |
150 | |
156 | |
166 | |
168 | |
174 | |
176 | |
183 | |
184 | |
190 | |
191 | |
196 | |
199 | |
200 | |
202 | |
203 | |
207 | |
215 | |
218 | |
224 | |
253 | |
254 | |
259 | |
263 | |
266 | |
269 | |
272 | |
279 | |
285 | |
287 | |
288 | |
291 | |
295 | |
301 | |
302 | |
303 | |
305 | |
312 | |
316 | |
317 | |
323 | |
331 | |
337 | |
345 | |
346 | |
347 | |
350 | |
353 | |
358 | |
364 | |
365 | |
369 | |
374 | |
377 | |
379 | |
380 | |
388 | |
397 | |
397 | |
397 | |
415 | |
485 | |
486 | |
489 | |
517 | |
Common terms and phrases
acre-feet Anchor Anchor bars auxiliary outlet backfill basin borrow area BUREAU OF RECLAMATION butterfly valve CENTRAL VALLEY PROJECT chute Clear Creek Power Conc construction Contraction joint Copley Creek Power Conduit crest cubic yards damsite DETAIL discharge diversion downstream draft tube drain excavation fault flip bucket flow fractured gate chamber gravel GREENSTONE Grout head hoist horizontal hydraulic inlet installed intake structure INTERIOR BUREAU Keswick Reservoir Lewiston liner load located material maximum meters operation outlet pipe penstock penstock header percent piezometer portal pounds per square pressure PROJECT TRINITY RIVER pump RECLAMATION CENTRAL VALLEY reinforcement relay reservoir reservoir water ring Riprap SCALE OF FEET second-feet SECTION A-A shear shown on figure slope spillway Spring Creek Powerplant square inch station stresses surge tank switch Trinity Dam TRINITY RIVER DIVISION TRINITY RIVER DIVISION-CALIFORNIA turbine UNITED STATES DEPARTMENT upstream VALLEY PROJECT TRINITY vertical weathered Weaverville Whiskeytown Zone
Popular passages
Page 179 - ... rpm When operating at pressures in excess of 100 psi, the engine speed will drop in proportion to the increase in discharge pressure; conversely, a decrease in discharge pressure will cause the engine to speed up. Engine speeds in excess of...
Page 222 - Engine driven generators will operate successfully at rated kva, frequency, and power factor at any voltage not more than 5 percent above or below rated voltage, but not necessarily in accordance with the standards of performance established for operation at normal rating except that inherently selfregulated type generators shall not be required to operate at other than rated voltage. Frequency Rating.
Page 372 - ... percent power factor, 6,900-volts, 3-phase, and 60-cycle at 600 rpm. Each generator is a vertical shaft type synchronous machine, designed for clockwise rotation when looking down on the unit. A thrust bearing and an upper guide bearing are provided above the rotor; a power guide bearing is provided below the rotor. A common oil reservoir is provided for the thrust and upper guide bearing, and there is a separate oil reservoir for the lower guide bearing. As the thrust bearing is supported by...
Page 365 - Worldwide attention to the requirements of the American Society of Mechanical Engineers...
Page 114 - ... any) and all piping conveying fuel in suspension in air exceeds 100 cubic feet all such piping shall be at least equal to the requirements of Paragraph 26, Specification No. 2, and all mixing and separating chambers shall either be constructed for a working pressure of 50 pounds per square inch with a factor of safety of 4 based on the ultimate strength of the material, or located in a separate room or floor cut off from the rest of the building and constructed in accordance with Section 13....
Page 48 - Triaxial Shear Tests on Pervious Gravelly Soils," Journal of the Soil Mechanics and Foundations Division.
Page 234 - The unit shall also be equipped with a pressure pump capable of delivering 100 gallons per minute at a pressure of 100 pounds per square inch.