Tecolote Tunnel: Technical Record of Design and Construction; Constructed 1950-1956; Cachuma Project, California |
Other editions - View all
Common terms and phrases
acre-feet Amount Unit Unit APPENDIX B Continued beds bulkhead BUREAU OF RECLAMATION Cachuma project Carpinteria cement Change Order chlorine concrete lining construction contracting officer contractor was directed downstream elevator shaft encountered excavation Extra Work Order fault zone FISH SCREEN flow Furnishing gallons per minute gate chamber gate valve Glen Anne Goleta grouting grouting operations H-beam heading hoist inlet leg inlet portal installed intake tower invert item description Quantity located Lump manent steel supports order for changes order was issued outlet leg outlet portal pay item description Pay item Property percent Peter Kiewit Sons pipe pounds per square pozzolan pressure grouting pump rock sandstone Santa Barbara Santa Barbara County Santa Ynez fault Santa Ynez Mountains Santa Ynez River sheared siltstone South Coast conduit square inch Tecolote Tunnel tion Total--Order for Changes TUBE VALVE tunnel lining tunnel section Unit Unit cost upstream ventilation venturi meter