Page 32
... gate hanger FI Finish E1403.88 Pipe handrail Sidpe in ig Rubber Water Sine . -Grout outlets : Specially compacted embankment . 1.5 · 0 ° 16′0'HA gates and 27-9 EL 1402.80 Sta . 7 + 63.44 4R Bituminous joint filler . Specially compacted ...
... gate hanger FI Finish E1403.88 Pipe handrail Sidpe in ig Rubber Water Sine . -Grout outlets : Specially compacted embankment . 1.5 · 0 ° 16′0'HA gates and 27-9 EL 1402.80 Sta . 7 + 63.44 4R Bituminous joint filler . Specially compacted ...
Page 45
... Gate chamber- 000 Gate No. 4 Gate No 1- Gole chamber . Sta 7 + 378 AN Gate No 2 Downstream conduit -Pipes- J. CONTROL HOUSE LIST OF PARTS PART DESCRIPTION MATERIAL NO NO . REOD of 1 Pipe hanger Steel 6 2 Pipe hanger Steel 19 J Pipe ...
... Gate chamber- 000 Gate No. 4 Gate No 1- Gole chamber . Sta 7 + 378 AN Gate No 2 Downstream conduit -Pipes- J. CONTROL HOUSE LIST OF PARTS PART DESCRIPTION MATERIAL NO NO . REOD of 1 Pipe hanger Steel 6 2 Pipe hanger Steel 19 J Pipe ...
Page 46
... gate hanger mounted on the head of the hoist cylinder of the regu- lating gates is connected into the piping system in such a manner that oil must pass through the hanger , releasing the clamp jaws , before the oil passes on to the ...
... gate hanger mounted on the head of the hoist cylinder of the regu- lating gates is connected into the piping system in such a manner that oil must pass through the hanger , releasing the clamp jaws , before the oil passes on to the ...
Page 92
... gate position indicator was installed in the control house for indicating position of the regulating high - pressure gates ... hanger anchors , and louvers and frames were furnished and installed by the contractor under this item . All ...
... gate position indicator was installed in the control house for indicating position of the regulating high - pressure gates ... hanger anchors , and louvers and frames were furnished and installed by the contractor under this item . All ...
Page 109
... Gate Chamber 604 - D - 19 --Jamestown Dam -- Outlet Works Control House and ... Hanger Anchor --Jamestown Dam -- Outlet Works -- Trashrack -- Stop Log Slot ... Gate -- Assembly with Hydraulic Hoist 40 - D - 5178 --Standard Designs -- 5 ...
... Gate Chamber 604 - D - 19 --Jamestown Dam -- Outlet Works Control House and ... Hanger Anchor --Jamestown Dam -- Outlet Works -- Trashrack -- Stop Log Slot ... Gate -- Assembly with Hydraulic Hoist 40 - D - 5178 --Standard Designs -- 5 ...
Common terms and phrases
access road acre-feet adit axis batch borrow area borrow pit boulders cement channel and stilling CLAY,LEAN clayey coarse cofferdam concrete construction Contraction joint contractor control house crest cross drain cubic foot cubic yards cutoff collars cutoff trench discharge channel downstream conduit drill embankment excavation fill floor foundation gate chamber gate hanger glacial till graded gravelly grout cap Gutter high-pressure gates inlet structure installed intake structure James River Jamestown Dam Jamestown Reservoir joint filler Layer of mortar load located maximum MISSOURI RIVER BASIN mod plastic operations outlet channel Pierre shale pounds per square pump reinforced reservoir RESERVOIR WATER riprap RIVER BASIN PROJECT river channel rock Rubber waterstop sand and gravel SAND WITH EXCESS sandy SCALE OF FEET second-feet SECTION C-C settlement points Sewer pipe drain SILT SILTY CLAY slope specially compacted spillway station steel stilling basin storage Stutsman County sump pump thin-bedded upstream vertical wall
Popular passages
Page 36 - ... n, the ratio of modulus of elasticity of steel to that of the concrete.
Page 5 - Reservoir was authorized by Section 9 of the Act of Congress approved December 22, 1944 (58 Stat. 887, 891), referred to as the Flood Control Act of 1944.