Delta-Mendota Canal: Constructed 1946-1952; Technical Record of Design and Construction |
Other editions - View all
Common terms and phrases
Abutment Anchor bolts barrel BUREAU OF RECLAMATION Calif CANAL BOTTOM GRADE canal lining CANAL SECTION CENTRAL VALLEY PROJECT CENTRAL VALLEY PROJECT-CALIFORNIA Compacted embankment concrete pipe construction contract contractor culvert Dehydrated cork filler DELTA Delta-Mendota Canal Delta-Mendota Canal--Station designed DETAIL dragline drain DRAINAGE INLET Earth Lined Elastic filler End alternate bars excavation extra work orders Farm Bridge Figure FLAP GATE Friant Dam Furnishing gravel hoists HYDRAULIC PROPERTIES inches indicate no rock installation INTERIOR BUREAU joint layers LINED SECTION Longit Los Banos Mendota Morrison-Knudsen operations orders for changes Original ground surface outlet pay item Pier Power Line Pumping Plant Radial gate RECLAMATION CENTRAL VALLEY reinforcement Sacramento River San Joaquin River sand SCALE OF FEET SCHEDULE SECTION C-C siltstone siphon slip form specifications station steel structures subgrade timber Tracy TYPICAL UNITED STATES DEPARTMENT unless otherwise shown VALLEY PROJECT-CALIFORNIA DELTA-MENDOTA wasteway wasteway turnout water surface Wire