Page 4
... project for Cashie River be modified to provide definitely for a depth of 10 feet from the mouth of the Thoroughfare ... existing traffic in sufficient amount to warrant the expenditures required . The Board therefore recommends that the ...
... project for Cashie River be modified to provide definitely for a depth of 10 feet from the mouth of the Thoroughfare ... existing traffic in sufficient amount to warrant the expenditures required . The Board therefore recommends that the ...
Page 5
... project is advisable at this time . 2. The report under review was submitted in compliance with an item in section 8 ... existing project . 3. Description . The lower portion of Cashie River between the Thoroughfare and the mouth is ...
... project is advisable at this time . 2. The report under review was submitted in compliance with an item in section 8 ... existing project . 3. Description . The lower portion of Cashie River between the Thoroughfare and the mouth is ...
Page 6
... Existing project . - The existing project for Cashie River , adopted by the River and Harbor Act of July 3 , 1930 , provides for the removal of logs , snags , and other obstructions from the mouth of the Thorough- fare in Roanoke River ...
... Existing project . - The existing project for Cashie River , adopted by the River and Harbor Act of July 3 , 1930 , provides for the removal of logs , snags , and other obstructions from the mouth of the Thorough- fare in Roanoke River ...
Page 10
... existing project for Cashie River , N. C. , be modified to provide for three cut - offs 80 feet wide through three sharp bends at points 1 , 4 , and 5 miles below Windsor , and for a turning basin having an area of about 1.10 acres at ...
... existing project for Cashie River , N. C. , be modified to provide for three cut - offs 80 feet wide through three sharp bends at points 1 , 4 , and 5 miles below Windsor , and for a turning basin having an area of about 1.10 acres at ...
Page 13
... Existing project . The existing project , adopted by the River and Harbor Act of July 3 , 1930 , provides for the removal of logs , snags , and other obstructions in Cashie River between the mouth of the Thoroughfare in Roanoke River ...
... Existing project . The existing project , adopted by the River and Harbor Act of July 3 , 1930 , provides for the removal of logs , snags , and other obstructions in Cashie River between the mouth of the Thoroughfare in Roanoke River ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet 30 feet additional anchorage annual cost Arecibo average Avery Island barges Bayou Petit Anse benefits Board of Engineers boats breakwater bulkhead capacity Cashie River Chief of Engineers coal Coan River commerce Committee on Rivers Congress construction County Creek damages depth district engineer division engineer draft drainage district dredging Engineers for Rivers entrance channel estimated cost existing project Federal feet deep fishing Flushing Bay freight Harbor Act highway hydro increase Indian River Indian River Bay interests intracoastal waterway jetty kilowatt kilowatt-hour land load factor located mean low water ment miles Mississippi River Mobile River modified mouth navigation Neah Bay operation Pass Cavallo percent plant pool Port Isabel Port Lavaca present proposed pumping recommended requested Rivers and Harbors savings ships shoals shore steam submitted terminal facilities tion tonnage tons traffic turning basin United vessels wharf wharves widening width yacht
Popular passages
Page 4 - Resolved by the Committee on Rivers and Harbors of the House of Representatives, United States, that the Board of Engineers for Rivers and Harbors created under section 3 of the River and Harbor Act, approved June 13...
Page 9 - Resolved by the Committee on Public Works of the United States Senate, That the Board of Engineers for Rivers and Harbors, created under Section 3, of the River and Harbor Act, approved June 13, 1902, be, and is hereby, requested to review the report of the Chief of Engineers on the Susquehanna River and tributaries.