Dams and Control Works: A Description of Representative Storage and Diversion Dams and High-pressure Reservoir Outlet Works Constructed by theA description of representative storage and diversion dams and high-pressure reservoir outlet works constructed by the Bureau of Reclamtion. |
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
American Falls Dam arch Arrowrock Arrowrock Dam back fill Boise project borrow pits built Bureau of Reclamation buttresses canyon cement cent channel cobbles cofferdams completed conduit construction contracting officer contraction joints contractor core wall cost Creek crest crete cubic yards cut-off trench depth discharge downstream face drainage drains drawings drilled earth elevation embankment emergency gate engineer excavation fault zone foot foundation furnished Government gravel grout holes hauling hoist Illus included installed irrigation located material maximum measured for payment ment metal miles needle valves North Platte project operation outlet Owyhee Dam paint paragraph Pathfinder Dam penstock pipe pits placed plant portion pressure grouting railroad reinforcing steel reservoir riprap river roller sand schedule second-feet shaft shown side slope sluice sluiceway solid rock specifications spillway storage stream bed structure suitable surface thickness timber tion tracting officer trash-rack unit prices bid upstream face vertical