Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1953 - Harbors |
From inside the book
Results 1-5 of 100
Page 1157
... Land- ing , Mo. ( sec . 12 , Flood Control Act ap- proved Dec. 22 , 1944 ) .. 1950 50,000.00 1 May be modified due to ... lands in the district deferred pending further study . Work under the project deferred pending decision regarding ...
... Land- ing , Mo. ( sec . 12 , Flood Control Act ap- proved Dec. 22 , 1944 ) .. 1950 50,000.00 1 May be modified due to ... lands in the district deferred pending further study . Work under the project deferred pending decision regarding ...
Page 1167
... lands as required for work underway . Possession of lands on the right bank in the vicinity of the lower lock has been obtained by the Government in condemnation proceedings instituted for the City of Minneapolis at the expense of the ...
... lands as required for work underway . Possession of lands on the right bank in the vicinity of the lower lock has been obtained by the Government in condemnation proceedings instituted for the City of Minneapolis at the expense of the ...
Page 1168
... lands on January 21 , 1949. The cash contribution of $ 41,200 and all lands and supporting data have been furnished . Supporting data have been checked and , after clearance of small details , final report will be issued in the near ...
... lands on January 21 , 1949. The cash contribution of $ 41,200 and all lands and supporting data have been furnished . Supporting data have been checked and , after clearance of small details , final report will be issued in the near ...
Page 1169
... lands , easements , and rights - of - way neces- sary for construction and maintenance of each of the harbor improve- ments , when and as required ; protect the upstream corner of the fill at the freight harbor with revetment , or ...
... lands , easements , and rights - of - way neces- sary for construction and maintenance of each of the harbor improve- ments , when and as required ; protect the upstream corner of the fill at the freight harbor with revetment , or ...
Page 1170
... lands , easements , and rights - of - way for construction and maintenance of the improvement , when and as re- quired ; and provide and maintain , without cost to the United States , necessary mooring facilities and utilities ...
... lands , easements , and rights - of - way for construction and maintenance of the improvement , when and as re- quired ; and provide and maintain , without cost to the United States , necessary mooring facilities and utilities ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet Allegheny River allotment annual report breakwater bridge Chief of Engineers completion of existing Condition at end Condition surveys Cong construction Control Act approved Cost and financial County Creek district drainage dredging end of fiscal ending June 30 existing project feet deep feet wide financial summary Fiscal fiscal year 1953 Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor House Public includ July June 28 June 30 Lake latest published map levee Location locks and dams Los Angeles River miles Miscellaneous inspections Mississippi River Missouri River mittee resolution mouth navigation Ohio River Ohio River Basin Operations and results operations.-The balance unexpended percent complete pier plans and specifications profitably expended project depth project was authorized Proposed operations.-The balance regular funds relocation reservoir results during fiscal revetment River and Harbor total cost Total to June tributaries turning basin United Wabash River
Popular passages
Page 1563 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as, in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1293 - The sum of $25,000,000 is authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers...
Page 1288 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 1230 - The improvement is subject to the conditions that responsible local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements and rights-of-way necessary for the construction of the project; (&) hold and save the United States free from damages...
Page 1408 - States, or municipalities; and provided further, mat in case high dams are built before the United States shall have built the projected locks and low dams which are to be replaced, the United States shall contribute to the cost of the substituted structures an amount equal to the estimated cost of the work of navigation for which substitution is made.
Page 1627 - The Flood Control Act of June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No.
Page 1642 - Reservoirs; subject to the condition that for each local flood-protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements, and rightsof-way necessary for the construction of the project; (6) hold and save the United States free from damages...
Page 1200 - ... channels in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $250,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1359 - ... works to prevent flood damage to highways, bridge approaches, and public works, when in the opinion of the Chief of Engineers such work is advisable : Provided, That not more than $50,000 shall be allotted for this purpose at any single locality from the appropriations for any one fiscal year.
Page 1572 - ... of any flood control work threatened or destroyed by flood, including the strengthening, raising, extending or other modification thereof as may be necessary in the discretion of the Chief of Engineers for the adequate functioning of the work for flood control.