Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1953 - Harbors |
From inside the book
Results 1-5 of 100
Page 1117
... Rock , Ark . , district .. UPPER MISSISSIPPI VALLEY DIVISION : Mississippi Rover between the Missouri River and Minneapolis , Minn ... Rock Island , Ill . , district . St. Paul , Minn . , district_ MISSOURI RIVER DIVISION : Kansas City ...
... Rock , Ark . , district .. UPPER MISSISSIPPI VALLEY DIVISION : Mississippi Rover between the Missouri River and Minneapolis , Minn ... Rock Island , Ill . , district . St. Paul , Minn . , district_ MISSOURI RIVER DIVISION : Kansas City ...
Page 1123
... Rocks canal ) , is about 74.5 percent complete . The quantities required to complete the project are estimated at 128,580 linear feet of dikes , 129,705 linear feet of revetment , 280,000 cubic yards of rock removal , and the canal ...
... Rocks canal ) , is about 74.5 percent complete . The quantities required to complete the project are estimated at 128,580 linear feet of dikes , 129,705 linear feet of revetment , 280,000 cubic yards of rock removal , and the canal ...
Page 1151
... Rocks canal , authorized by the River and Harbor Act of March 2 , 1945. As the major portion of the district lies east of the proposed Chain of Rocks canal , it will be protected by the canal and the East St. Louis , Ill . , levees . It ...
... Rocks canal , authorized by the River and Harbor Act of March 2 , 1945. As the major portion of the district lies east of the proposed Chain of Rocks canal , it will be protected by the canal and the East St. Louis , Ill . , levees . It ...
Page 1163
... Rock Island , Ill . , and St. Paul , Minn . The section in the St. Louis District extends from the mouth of the Missouri River to mile 300 above the Ohio River , a distance of about 105 miles ; the Rock Island District extends from mile ...
... Rock Island , Ill . , and St. Paul , Minn . The section in the St. Louis District extends from the mouth of the Missouri River to mile 300 above the Ohio River , a distance of about 105 miles ; the Rock Island District extends from mile ...
Page 1164
... Rock and piles in gravel . Piles in gravel . 81 1917 $ 2,524 , 600 Lock and dam 2 . 815.2 1.3 miles above Hastings , 110 500 12.2 16.0 15.1 Piles in sand , silt , Piles in sand , silt , 1930 Minn . 8110 8 600 12.2 687.2 22.2 13.0 clay ...
... Rock and piles in gravel . Piles in gravel . 81 1917 $ 2,524 , 600 Lock and dam 2 . 815.2 1.3 miles above Hastings , 110 500 12.2 16.0 15.1 Piles in sand , silt , Piles in sand , silt , 1930 Minn . 8110 8 600 12.2 687.2 22.2 13.0 clay ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet Allegheny River allotment annual report breakwater bridge Chief of Engineers completion of existing Condition at end Condition surveys Cong construction Control Act approved Cost and financial County Creek district drainage dredging end of fiscal ending June 30 existing project feet deep feet wide financial summary Fiscal fiscal year 1953 Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor House Public includ July June 28 June 30 Lake latest published map levee Location locks and dams Los Angeles River miles Miscellaneous inspections Mississippi River Missouri River mittee resolution mouth navigation Ohio River Ohio River Basin Operations and results operations.-The balance unexpended percent complete pier plans and specifications profitably expended project depth project was authorized Proposed operations.-The balance regular funds relocation reservoir results during fiscal revetment River and Harbor total cost Total to June tributaries turning basin United Wabash River
Popular passages
Page 1563 - June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as, in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1293 - The sum of $25,000,000 is authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers...
Page 1288 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 1230 - The improvement is subject to the conditions that responsible local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements and rights-of-way necessary for the construction of the project; (&) hold and save the United States free from damages...
Page 1408 - States, or municipalities; and provided further, mat in case high dams are built before the United States shall have built the projected locks and low dams which are to be replaced, the United States shall contribute to the cost of the substituted structures an amount equal to the estimated cost of the work of navigation for which substitution is made.
Page 1627 - The Flood Control Act of June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No.
Page 1642 - Reservoirs; subject to the condition that for each local flood-protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements, and rightsof-way necessary for the construction of the project; (6) hold and save the United States free from damages...
Page 1200 - ... channels in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $250,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1359 - ... works to prevent flood damage to highways, bridge approaches, and public works, when in the opinion of the Chief of Engineers such work is advisable : Provided, That not more than $50,000 shall be allotted for this purpose at any single locality from the appropriations for any one fiscal year.
Page 1572 - ... of any flood control work threatened or destroyed by flood, including the strengthening, raising, extending or other modification thereof as may be necessary in the discretion of the Chief of Engineers for the adequate functioning of the work for flood control.