Dams and Control Works, Volume 2U.S. Government Printing Office, 1938 - Dams A description of representative storage and diversion dams and high-pressure reservoir outlet works constructed by the Bureau of Reclamtion. |
From inside the book
Results 1-2 of 2
Page 33
tion to adjacent risers. The l%- and 2-inch grout headers and return pipes are
installed preparatory to being embedded within the block. Vertical key ways are
formed on the joints, transverse to the axis of the dam, while along the
longitudinal ...
tion to adjacent risers. The l%- and 2-inch grout headers and return pipes are
installed preparatory to being embedded within the block. Vertical key ways are
formed on the joints, transverse to the axis of the dam, while along the
longitudinal ...
Page 118
Engineering News-Record, June 18, 1931. Echo Dam, Progress of Construction.
Western Construe- Construction of the Echo Dam. Reclamation Era, tion News,
Dec. 10, 1929. October 1931. McKAY DAM UMATILLA PROJECT, OREGON BY ...
Engineering News-Record, June 18, 1931. Echo Dam, Progress of Construction.
Western Construe- Construction of the Echo Dam. Reclamation Era, tion News,
Dec. 10, 1929. October 1931. McKAY DAM UMATILLA PROJECT, OREGON BY ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
abutment aggregate All-American Canal approximately arch average base bottom Boulder Dam built Bureau canal cantilever canyon capacity carried cement centers chamber channel closed completed concrete connected consisted construction contract cooling cost crest cubic yards cut-off depth designed developed diameter discharge diversion downstream drilled earth effects elevation embankment Engineering excavation extending face feet Figure floor flow forms foundation gallery gates gravel gravity grout head height holes horizontal inches installed joints length load located lower material maximum method miles mixing needle valves obtained operating outlet pipe placed plant portion pounds pressure pump radial reinforced removed reservoir river rock roller sand shaft side slope spillway square steel storage stream stresses structure supply surface temperature tests thickness tion tower tunnel Unit upper upstream varying vertical wall wide