Dams and Control Works, Volume 2U.S. Government Printing Office, 1938 - Dams A description of representative storage and diversion dams and high-pressure reservoir outlet works constructed by the Bureau of Reclamtion. |
From inside the book
Results 1-5 of 34
Page
... TEMPERATURE CONTROL OF MASS CONCRETE IN LARGE DAMS DESIGN AND CONSTRUCTION OF SMALL EARTH DAMS 243 252 DAMS CONSTRUCTED BY THE BUREAU OF RECLAMATION ( Table ) . 258 1 PART ONE STORAGE DAMS A BOULDER DAM BOULDER CANYON VII.
... TEMPERATURE CONTROL OF MASS CONCRETE IN LARGE DAMS DESIGN AND CONSTRUCTION OF SMALL EARTH DAMS 243 252 DAMS CONSTRUCTED BY THE BUREAU OF RECLAMATION ( Table ) . 258 1 PART ONE STORAGE DAMS A BOULDER DAM BOULDER CANYON VII.
Page 3
... temperatures at the dam site during the summer months necessitated the selection of a town site where more comfortable living quarters could be provided . A site was selected on the summit of the divide about 7 miles from the dam site ...
... temperatures at the dam site during the summer months necessitated the selection of a town site where more comfortable living quarters could be provided . A site was selected on the summit of the divide about 7 miles from the dam site ...
Page 4
... temperature in the tunnels was extremely high , and the humidity resulting from the spraying made working conditions unbearable . As a result , an asphalt oil coating , applied with compressed air ( the Hunt process ) , was used for ...
... temperature in the tunnels was extremely high , and the humidity resulting from the spraying made working conditions unbearable . As a result , an asphalt oil coating , applied with compressed air ( the Hunt process ) , was used for ...
Page 8
... temperature and water loads were checked by de- tailed experimental investigations on two models of the entire structure , a slab model of the crown cantilever , and a slab model of an arch element at an elevation about halfway between ...
... temperature and water loads were checked by de- tailed experimental investigations on two models of the entire structure , a slab model of the crown cantilever , and a slab model of an arch element at an elevation about halfway between ...
Page 10
... temperature of the concrete was obtained by re- sistance thermometers buried in the concrete or inserted in the end of the cooling pipe at the slot . For cooling tower operations , the average temperature difference for water entering ...
... temperature of the concrete was obtained by re- sistance thermometers buried in the concrete or inserted in the end of the cooling pipe at the slot . For cooling tower operations , the average temperature difference for water entering ...
Other editions - View all
Common terms and phrases
acre-feet aggregate All-American Canal arch Arrowrock Dam basin borrow pit Boulder Dam bronze BUREAU OF RECLAMATION buttress cableway canal cantilever canyon walls cement centers channel cofferdam construction contraction joints cooling cost crest cubic yards cut-off wall cylinder deflections designed diameter discharge diversion tunnel downstream face drain drainage drilled dumped earth elevation embankment emergency gates Engineering excavation feet long foundation gallery gate chamber Grand Coulee Grand Coulee Dam gravel gravity grout grout holes hoist horizontal hydraulic Imperial Dam Installing and painting irrigation left abutment located lower material maximum miles mixer needle valves operation outlet Owyhee Dam penstock pipe placed pounds per square pressure pump radial reservoir reservoir water right abutment riprap river rock fill roller sand second-feet shaft side slope sluice sluiceway spillway square inch steel storage stresses structure temperature tests thickness tion trashrack trial load upstream face vertical water surface