Dams and Control Works, Volume 2U.S. Government Printing Office, 1938 - Dams A description of representative storage and diversion dams and high-pressure reservoir outlet works constructed by the Bureau of Reclamtion. |
From inside the book
Results 1-5 of 100
Page
... PRESSURE RESERVOIR OUTLET WORKS CONSTRUCTED BY THE BUREAU OF RECLAMATION JOHN C. PAGE , Commissioner ATMENT OF HE INTERIO SECOND EDITION PRICE $ 1.00 UNITED STATES GOVERNMENT PRINTING OFFICE • WASHINGTON • FEBRUARY 1938 511 Forestry T ...
... PRESSURE RESERVOIR OUTLET WORKS CONSTRUCTED BY THE BUREAU OF RECLAMATION JOHN C. PAGE , Commissioner ATMENT OF HE INTERIO SECOND EDITION PRICE $ 1.00 UNITED STATES GOVERNMENT PRINTING OFFICE • WASHINGTON • FEBRUARY 1938 511 Forestry T ...
Page
... PRESSURE RESERVOIR OUTLETS . HYDRAULIC MODEL TESTING OF STRUCTURES STRUCTURAL MODEL TESTING OF DAMS 174 177 205 213 CONCRETE LABORATORY OPERATIONS 227 EARTH MATERIALS LABORATORY OPERATION 232 TRIAL LOAD METHOD OF ANALYZING ARCH DAMS 235 ...
... PRESSURE RESERVOIR OUTLETS . HYDRAULIC MODEL TESTING OF STRUCTURES STRUCTURAL MODEL TESTING OF DAMS 174 177 205 213 CONCRETE LABORATORY OPERATIONS 227 EARTH MATERIALS LABORATORY OPERATION 232 TRIAL LOAD METHOD OF ANALYZING ARCH DAMS 235 ...
Page 5
... pressure , using a duplex , air - driven , piston grout pump . mounted on a truck with the mixing apparatus . Low - pressure grout holes were drilled through the invert and lower side walls to grout the temporary drainage sys- tems in ...
... pressure , using a duplex , air - driven , piston grout pump . mounted on a truck with the mixing apparatus . Low - pressure grout holes were drilled through the invert and lower side walls to grout the temporary drainage sys- tems in ...
Page 6
... pressure . Grouting equipment consisted of a grout mixer , a mechanically operated sump , and two high- pressure mud pumps mounted on a truck for mobility . More than 5,200 linear feet of " B " holes were drilled , taking a total of ...
... pressure . Grouting equipment consisted of a grout mixer , a mechanically operated sump , and two high- pressure mud pumps mounted on a truck for mobility . More than 5,200 linear feet of " B " holes were drilled , taking a total of ...
Page 7
... pressures vary- ing from 500 to 750 pounds per square inch . A total of 7,325 linear feet of holes was drilled and ... pressure grouting for the diversion tunnels . THE DAM Boulder Dam is a concrete arch - gravity structure in which ...
... pressures vary- ing from 500 to 750 pounds per square inch . A total of 7,325 linear feet of holes was drilled and ... pressure grouting for the diversion tunnels . THE DAM Boulder Dam is a concrete arch - gravity structure in which ...
Other editions - View all
Common terms and phrases
acre-feet aggregate All-American Canal arch Arrowrock Dam basin borrow pit Boulder Dam bronze BUREAU OF RECLAMATION buttress cableway canal cantilever canyon walls cement centers channel cofferdam construction contraction joints cooling cost crest cubic yards cut-off wall cylinder deflections designed diameter discharge diversion tunnel downstream face drain drainage drilled dumped earth elevation embankment emergency gates Engineering excavation feet long foundation gallery gate chamber Grand Coulee Grand Coulee Dam gravel gravity grout grout holes hoist horizontal hydraulic Imperial Dam Installing and painting irrigation left abutment located lower material maximum miles mixer needle valves operation outlet Owyhee Dam penstock pipe placed pounds per square pressure pump radial reservoir reservoir water right abutment riprap river rock fill roller sand second-feet shaft side slope sluice sluiceway spillway square inch steel storage stresses structure temperature tests thickness tion trashrack trial load upstream face vertical water surface