Page 4
For the purpose of applying concrete lining, the circular section was divided into
three parts — the lower 74° for the invert, to be placed first; above this section, on
either side, the side wall portions of 88° each, to be placed second; and above ...
For the purpose of applying concrete lining, the circular section was divided into
three parts — the lower 74° for the invert, to be placed first; above this section, on
either side, the side wall portions of 88° each, to be placed second; and above ...
Page 227
THE BUREAU has established, in Denver, complete laboratory facilities for
investigating and testing concrete and all materials used in concrete construction.
These facilities include a thoroughly trained personnel and modern equipment
and ...
THE BUREAU has established, in Denver, complete laboratory facilities for
investigating and testing concrete and all materials used in concrete construction.
These facilities include a thoroughly trained personnel and modern equipment
and ...
Page 258
None Humboldt- Carson Truckee Little Truckee. Pecos.- do. Type Concrete,
multiple arch Reinforced concrete, multiple arch. Concrete, variable radius arch
do Rubble masonry, arch-gravity Concrete, variable radius arch, gravity
abutments.
None Humboldt- Carson Truckee Little Truckee. Pecos.- do. Type Concrete,
multiple arch Reinforced concrete, multiple arch. Concrete, variable radius arch
do Rubble masonry, arch-gravity Concrete, variable radius arch, gravity
abutments.
Page 259
DIVERSION DAMS— Continued F.arth dike, concrete ogee spillway Reinforced
concrete. Project New Mexico-Texas: Rio Grande.. Do Do Oregon: Baker Burnt
River -- Umatilla Do Vale Do Oregon-California: Klamath Do Do Do Oregon-
Idaho: ...
DIVERSION DAMS— Continued F.arth dike, concrete ogee spillway Reinforced
concrete. Project New Mexico-Texas: Rio Grande.. Do Do Oregon: Baker Burnt
River -- Umatilla Do Vale Do Oregon-California: Klamath Do Do Do Oregon-
Idaho: ...
Page 260
Joint Head, Power Canal .do., .do- Reinforced concrete, ogee weir, earth dikes.
Concrete weir, earth dikes Concrete ogee weir, earth dike. . Parker ». Laguna. -
Colorado . do... Concrete, variable radius arch Indian weir, concrete and rock fill.
Joint Head, Power Canal .do., .do- Reinforced concrete, ogee weir, earth dikes.
Concrete weir, earth dikes Concrete ogee weir, earth dike. . Parker ». Laguna. -
Colorado . do... Concrete, variable radius arch Indian weir, concrete and rock fill.
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
abutment aggregate All-American Canal approximately arch average base bottom Boulder Dam built Bureau canal cantilever canyon capacity carried cement centers chamber channel closed completed concrete connected consisted construction contract cooling cost crest cubic yards cut-off depth designed developed diameter discharge diversion downstream drilled earth effects elevation embankment Engineering excavation extending face feet Figure floor flow forms foundation gallery gates gravel gravity grout head height holes horizontal inches installed joints length load located lower material maximum method miles mixing needle valves obtained operating outlet pipe placed plant portion pounds pressure pump radial reinforced removed reservoir river rock roller sand shaft side slope spillway square steel storage stream stresses structure supply surface temperature tests thickness tion tower tunnel Unit upper upstream varying vertical wall wide