Highway embankment: Earth and gravel fill, downstream from axis of the dam, from borrow (see also claim no. 14 at p. 141). Highway embankment: Rolled earth or puddled core in central portion of rock fill upstream from axis of the dam, from borrow (see also contractor's claim "a" at p. 141). Highway embankment: Rock fill upstream from axis of dam, wasted under schedule 1 and rehandled under schedule 2 (see also note 3, and O. C. no. 9 at p. 140). Highway embankment: Rock 61 fill upstream from axis of the dam, from borrow. |