Water Resources Development-1973, Hearings Before the Subcommittee on Water Resources ..., 93-1, on H.R. 4904, 4905, and Related Bills1973 - 1443 pages |
From inside the book
Results 1-5 of 100
Page 86
... channel and Marais de St. Friol , a back channel extending upstream to the end of the city . The residential and business districts on the mainland are generally between elevations 627 and 640 m.s.l. , and St. Friol Island is almost ...
... channel and Marais de St. Friol , a back channel extending upstream to the end of the city . The residential and business districts on the mainland are generally between elevations 627 and 640 m.s.l. , and St. Friol Island is almost ...
Page 148
... channel on Harris Fork and South Fulton Branch in Fulton and South Fulton , and about 10 miles of channel enlargement from South Fulton down- stream to the junction with North Fork Obion River . The estimated Federal cost of the project ...
... channel on Harris Fork and South Fulton Branch in Fulton and South Fulton , and about 10 miles of channel enlargement from South Fulton down- stream to the junction with North Fork Obion River . The estimated Federal cost of the project ...
Page 151
... channel improvement . The impact of the alternate channel sizes on the natural environment would be the same as for the recommended plan . Recommended Plan of Improvement . The recommended plan of improvement consists of about 1.2 miles ...
... channel improvement . The impact of the alternate channel sizes on the natural environment would be the same as for the recommended plan . Recommended Plan of Improvement . The recommended plan of improvement consists of about 1.2 miles ...
Page 155
... channel work in the urban area to complement and coordinate with the new realigned channel to be constructed by the city of Fulton , Kentucky , as part of the " Banana Festi- val City " urban renewal project being planned . The scope ...
... channel work in the urban area to complement and coordinate with the new realigned channel to be constructed by the city of Fulton , Kentucky , as part of the " Banana Festi- val City " urban renewal project being planned . The scope ...
Page 156
... channel stabilizes . Timber within the project right - of- way must be removed and growth rates of remaining hardwoods will be reduced slightly because of a slight lowering of the water table near the stream . The remaining small - game ...
... channel stabilizes . Timber within the project right - of- way must be removed and growth rates of remaining hardwoods will be reduced slightly because of a slight lowering of the water table near the stream . The remaining small - game ...
Common terms and phrases
acquisition acres annual benefits annual charges Arkansas River Army authorized beach benefit-cost ratio Board of Engineers channel improvements Charles River Chief of Engineers Colonel IRVING construction Corps of Engineers County Department Director of Civil District Engineer Division Engineer downstream dredging easements economic Engineers for Rivers environmental impact erosion existing facilities Fall Creek feet fish and wildlife Flood Control Act flood damages flood plain flood protection Forked Deer Rivers Friol Harris Fork Creek Lake land levee located maintenance Management and Budget Maury River ment miles mitigation modification navigation needs Numbered Obion River Office of Management operation percent plan of improvement Port Prairie du Chien proposed project recommended plan recreation and fish relocation reporting officers reservoir River and Tributaries River Basin Rivers and Harbors ROBERTS Santa Clara River Secretary South Umpqua River storage stream Tennessee Thames River tion upstream urban water resources water supply Yazoo
Popular passages
Page 888 - States, outside established harbor lines, or where no harbor lines have been established, except on plans recommended by the Chief of Engineers and authorized by the Secretary of War; and it shall not be lawful to excavate or fill, or in any manner to alter or modify the course, location, condition, or capacity of any port, roadstead, haven, harbor, canal...
Page 456 - Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 639 - Army that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 638 - IN WITNESS WHEREOF, the parties hereto have executed this Contract as of the day and year first above written.
Page 888 - War; and it shall not be lawful to excavate or fill, or in any manner to alter or modify the course, location, condition, or capacity of any port, roadstead, haven, harbor, canal, lake, harbor of refuge, or inclosure within the limits of any breakwater, or of the channel of any navigable water of the United States, unless the work has been recommended by the Chief of Engineers and authorized by the Secretary of War prior to beginning the same.
Page 571 - Senate, That the Board of Engineers for Rivers and Harbors, created under Section 3 of the River and Harbor Act approved June 13, 1902, be, and is hereby requested to review the report...
Page 341 - Mascaras, and various nonstructural measures, all generally in accordance with the plan of the District Engineer and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Page 874 - Committee of the Section of Real Property, Probate and Trust Law of the American Bar Association WILLIAM P.
Page 376 - States free from damages that may result from construction and maintenance of the project; (3) provide and maintain at local expense adequate public terminal and transfer facilities open to all on equal terms; and...
Page 413 - States of $2,252,000 for construction; provided that local interests give assurances satisfactory to the Secretary of the Army...