Page images
PDF
EPUB
[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed]
[graphic][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed]

PLATE 12

Revenue from sale of Firm Power at 1.63 mills per kw. hr. based on sale of 64% of Firm Power as absorbed by the City of Los Angeles and the Southern California Edison Co. with no payments on $25,000,000 Flood Control. Firm Power defined as 4,330,000,000 kw.hr. per year at Completion of Dam, and decreasing at rate of 8,760,000 kw. hr. per year thereafter.

[merged small][graphic][subsumed][subsumed][ocr errors][subsumed][merged small][subsumed][merged small][merged small]

"A"=Accumulated Payments to Nevada and Arizona $1,258,000 372% of Surplus.

"B"-Accumulated Surplus U.S.$2,056,000 62% of Surplus.

[blocks in formation]

Firm power defined as 4,330,000,000 kw.hr. per year at completion of dam, and decreasing at rate of 8,760,000 kw. hr. per year thereafter. Secondary power average taken as 1,550,000,000 kw.hr. per year at completion of dam and decreasing at rate of 8,600,000 kw.hr. per year therafter.

SEE TABLE B-5 FOR DATA

[blocks in formation]

Revenue from sale of firm power at 1.63 mills per kw. hr. and
sale of secondary power at 0.5 mills per kw. hr., based on sale
of 64% of firm power as absorbed by the city of Los Angeles
and the Southern California Edison Co., with no payments on
$25,000,000 flood control.

PLATE 13

3

5

OF DOLLARS MILLIONS

PER YEAR

589

[graphic]
« PreviousContinue »