Report of the Chief of Engineers U.S. Army, Volume 1, Part 1U.S. Government Printing Office, 1952 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 5
... plans , proposals , or reports of the Chief of Engi- neers for any works of improvement for navigation or flood con- trol not previously authorized , or authorized in the Flood Control Act of December 22 , 1944 , shall be submitted to ...
... plans , proposals , or reports of the Chief of Engi- neers for any works of improvement for navigation or flood con- trol not previously authorized , or authorized in the Flood Control Act of December 22 , 1944 , shall be submitted to ...
Page 8
... plans for the river basins of the Nation to provide desirable and economic flood protection and allied benefits for ... Planning : New funds appropriated by the Civil Functions Appropriation Act , 1952 , referred to above , included for ...
... plans for the river basins of the Nation to provide desirable and economic flood protection and allied benefits for ... Planning : New funds appropriated by the Civil Functions Appropriation Act , 1952 , referred to above , included for ...
Page 10
... planning in- cluding preparation of detailed plans and contract plans was continued . MISSISSIPPI RIVER FLOOD CONTROL Progress was made during the fiscal year 1951 on the flood- control project for the alluvial valley of the Mississippi ...
... planning in- cluding preparation of detailed plans and contract plans was continued . MISSISSIPPI RIVER FLOOD CONTROL Progress was made during the fiscal year 1951 on the flood- control project for the alluvial valley of the Mississippi ...
Page 122
... plans were substantially complete . No construction work has been done . Total costs and expenditures from regular funds for new work have been $ 69,736.88 . Proposed operations . Funds unexpended at the end of the fiscal year ...
... plans were substantially complete . No construction work has been done . Total costs and expenditures from regular funds for new work have been $ 69,736.88 . Proposed operations . Funds unexpended at the end of the fiscal year ...
Page 126
... plans were com- plete . Contract plans and specifications were approximately 45 percent complete . No construction work has been done . Total costs and expenditures from regular funds for new work have been $ 114,637.68 . Proposed ...
... plans were com- plete . Contract plans and specifications were approximately 45 percent complete . No construction work has been done . Total costs and expenditures from regular funds for new work have been $ 114,637.68 . Proposed ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet deep 1st sess 2d sess 30 feet Accounts payable anchorage Annual Report Bayou bridge Canal Chief of Engineers Committee resolution Condition at end Cong Connecticut River construction contract contributed funds controlling depths cooperation Cost and financial costs and expenditures Creek cubic yards dredging end of fiscal ending June 30 existing project feet long financial summary 1947 fiscal year 1952 Fiscal year ending fiscal years prior Flood Control Act Geodetic Survey Chart Gulf of Mexico Harbor Act hired labor including fiscal jetties Johns River July 24 June 25 June 30 Lake Lake Okeechobee latest published map levee mean low water miles mouth navigation Operations and results previous projects project dimensions project was authorized Proposed operations Report for 1938 reservoir results during fiscal revised in 1951 River and Harbor Terminal facilities thence total costs Total to June turning basin U. S. Coast wharves width