Report of the Chief of Engineers U.S. Army, Volume 1, Part 1U.S. Government Printing Office, 1952 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page
... percent of all work performed having been done by contract , and 21 percent by Government plant and hired labor . The continuation of an adequate check on the cost of work per- formed on river and harbor and flood - control projects has ...
... percent of all work performed having been done by contract , and 21 percent by Government plant and hired labor . The continuation of an adequate check on the cost of work per- formed on river and harbor and flood - control projects has ...
Page 2
... percent of all work performed having been done by contract , and 21 percent by Government plant and hired labor . The continuation of an adequate check on the cost of work per- formed on river and harbor and flood - control projects has ...
... percent of all work performed having been done by contract , and 21 percent by Government plant and hired labor . The continuation of an adequate check on the cost of work per- formed on river and harbor and flood - control projects has ...
Page 77
... percent of the inner harbor and of the basin ; a jetty about 140 feet long southeast of main breakwater having a T - head 100 feet across . The mean tidal range is 2.9 feet , and the maxi- mum range , due to the combined effects of wind ...
... percent of the inner harbor and of the basin ; a jetty about 140 feet long southeast of main breakwater having a T - head 100 feet across . The mean tidal range is 2.9 feet , and the maxi- mum range , due to the combined effects of wind ...
Page 79
... percent of the esti- mated first cost , but not to exceed $ 8,000 , furnish free of cost to the United States suitably bulkheaded areas for spoil disposal for the initial work and subsequent maintenance , when and as required , and hold ...
... percent of the esti- mated first cost , but not to exceed $ 8,000 , furnish free of cost to the United States suitably bulkheaded areas for spoil disposal for the initial work and subsequent maintenance , when and as required , and hold ...
Page 84
... percent of the initial construction cost and give assurances satisfactory to the Secretary of War that they will provide a suitable public landing in the cove . The River and Harbor Act of May 17 , 1950 , authorized the channel ...
... percent of the initial construction cost and give assurances satisfactory to the Secretary of War that they will provide a suitable public landing in the cove . The River and Harbor Act of May 17 , 1950 , authorized the channel ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet deep 1st sess 2d sess 30 feet Accounts payable anchorage Annual Report Bayou bridge Canal Chief of Engineers Committee resolution Condition at end Cong Connecticut River construction contract contributed funds controlling depths cooperation Cost and financial costs and expenditures Creek cubic yards dredging end of fiscal ending June 30 existing project feet long financial summary 1947 fiscal year 1952 Fiscal year ending fiscal years prior Flood Control Act Geodetic Survey Chart Gulf of Mexico Harbor Act hired labor including fiscal jetties Johns River July 24 June 25 June 30 Lake Lake Okeechobee latest published map levee mean low water miles mouth navigation Operations and results previous projects project dimensions project was authorized Proposed operations Report for 1938 reservoir results during fiscal revised in 1951 River and Harbor Terminal facilities thence total costs Total to June turning basin U. S. Coast wharves width