Report of the Chief of Engineers U.S. Army, Volume 1, Part 1U.S. Government Printing Office, 1952 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 7
... follows : ( a ) It provided authoriza- tion for the construction of small flood - control projects , subject to certain conditions of local cooperation , and economic justifica- tion , provided the cost of each project does not exceed ...
... follows : ( a ) It provided authoriza- tion for the construction of small flood - control projects , subject to certain conditions of local cooperation , and economic justifica- tion , provided the cost of each project does not exceed ...
Page 49
... follows : Regular funds . Public works funds .. Emergency relief funds . Total .. Costs New work Maintenance Total Expenditures $ 13,903,692 . 14 1,030,806 . 26 935,303.03 $ 1,500,593.99 $ 15,404,286 . 13 1,030,806 . 26 935,303.03 ...
... follows : Regular funds . Public works funds .. Emergency relief funds . Total .. Costs New work Maintenance Total Expenditures $ 13,903,692 . 14 1,030,806 . 26 935,303.03 $ 1,500,593.99 $ 15,404,286 . 13 1,030,806 . 26 935,303.03 ...
Page 57
... follows : Accounts payable June 30 , 1951 Maintenance : Completion of contract for painting Buzzards Bay Railroad ... follow- ing schedule of work during fiscal year 1953 . Maintenance : Dredging by United States seagoing hopper dredge ...
... follows : Accounts payable June 30 , 1951 Maintenance : Completion of contract for painting Buzzards Bay Railroad ... follow- ing schedule of work during fiscal year 1953 . Maintenance : Dredging by United States seagoing hopper dredge ...
Page 73
... follows : 33 feet in the channel from abreast North Point to Field Point ( 1942-48 ) ; thence generally 35 feet to Fox Point ( 1949 ) . The costs under the existing project have been $ 3,297,936.97 , of which $ 2,322,233.67 was for new ...
... follows : 33 feet in the channel from abreast North Point to Field Point ( 1942-48 ) ; thence generally 35 feet to Fox Point ( 1949 ) . The costs under the existing project have been $ 3,297,936.97 , of which $ 2,322,233.67 was for new ...
Page 78
... follows : A condition survey , by hired labor , of the entrance channel . Maintenance dredging , by contract , of the entrance channel to the project depth of 15 feet for a limited width Total .... No work is scheduled for fiscal year ...
... follows : A condition survey , by hired labor , of the entrance channel . Maintenance dredging , by contract , of the entrance channel to the project depth of 15 feet for a limited width Total .... No work is scheduled for fiscal year ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet deep 1st sess 2d sess 30 feet Accounts payable anchorage Annual Report Bayou bridge Canal Chief of Engineers Committee resolution Condition at end Cong Connecticut River construction contract contributed funds controlling depths cooperation Cost and financial costs and expenditures Creek cubic yards dredging end of fiscal ending June 30 existing project feet long financial summary 1947 fiscal year 1952 Fiscal year ending fiscal years prior Flood Control Act Geodetic Survey Chart Gulf of Mexico Harbor Act hired labor including fiscal jetties Johns River July 24 June 25 June 30 Lake Lake Okeechobee latest published map levee mean low water miles mouth navigation Operations and results previous projects project dimensions project was authorized Proposed operations Report for 1938 reservoir results during fiscal revised in 1951 River and Harbor Terminal facilities thence total costs Total to June turning basin U. S. Coast wharves width