Report of the Chief of Engineers U.S. Army, Volume 1, Part 1U.S. Government Printing Office, 1952 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 4
... COMMERCE The water - borne commerce of the United States , Puerto Rico , Alaska , and the Hawaiian Islands for the calendar year 1950 is contained in Part 2 of the Annual Report for the fiscal year 1951 . PHILIPPINE PORT REHABILITATION ...
... COMMERCE The water - borne commerce of the United States , Puerto Rico , Alaska , and the Hawaiian Islands for the calendar year 1950 is contained in Part 2 of the Annual Report for the fiscal year 1951 . PHILIPPINE PORT REHABILITATION ...
Page 12
... commerce , and produce widespread destruction and disorder , national in scope . As flood control of this vast alluvial valley and navigation of the lower Mississippi River are important to the national economy and to the security of a ...
... commerce , and produce widespread destruction and disorder , national in scope . As flood control of this vast alluvial valley and navigation of the lower Mississippi River are important to the national economy and to the security of a ...
Page 29
... commerce . Operations and results during fiscal year . Maintenance dredg- ing , by U. S. Hopper Dredge Lyman , was commenced on Novem- ber 1 , 1950 , and was completed on November 15 , 1950. During this period 108,830 cubic yards of ...
... commerce . Operations and results during fiscal year . Maintenance dredg- ing , by U. S. Hopper Dredge Lyman , was commenced on Novem- ber 1 , 1950 , and was completed on November 15 , 1950. During this period 108,830 cubic yards of ...
Page 53
... commerce . Operations and results during fiscal year . A condition survey , by hired labor , was completed in August 1950 , at a cost of $ 2,500.00 . The expenditures were $ 2,500.00 . Condition at end of fiscal year . The existing ...
... commerce . Operations and results during fiscal year . A condition survey , by hired labor , was completed in August 1950 , at a cost of $ 2,500.00 . The expenditures were $ 2,500.00 . Condition at end of fiscal year . The existing ...
Page 59
... commerce . The costs and expenditures under the existing project have been $ 1,083,504.41 for new work , and $ 732,405.15 for maintenance , a total of $ 1,815,909.56 . Proposed operations . No work is scheduled for the fiscal year 1952 ...
... commerce . The costs and expenditures under the existing project have been $ 1,083,504.41 for new work , and $ 732,405.15 for maintenance , a total of $ 1,815,909.56 . Proposed operations . No work is scheduled for the fiscal year 1952 ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet deep 1st sess 2d sess 30 feet Accounts payable anchorage Annual Report Bayou bridge Canal Chief of Engineers Committee resolution Condition at end Cong Connecticut River construction contract contributed funds controlling depths cooperation Cost and financial costs and expenditures Creek cubic yards dredging end of fiscal ending June 30 existing project feet long financial summary 1947 fiscal year 1952 Fiscal year ending fiscal years prior Flood Control Act Geodetic Survey Chart Gulf of Mexico Harbor Act hired labor including fiscal jetties Johns River July 24 June 25 June 30 Lake Lake Okeechobee latest published map levee mean low water miles mouth navigation Operations and results previous projects project dimensions project was authorized Proposed operations Report for 1938 reservoir results during fiscal revised in 1951 River and Harbor Terminal facilities thence total costs Total to June turning basin U. S. Coast wharves width