Report of the Chief of Engineers U.S. Army, Volume 1, Part 1U.S. Government Printing Office, 1952 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 5
... acts also specified the local cooperation required for the projects authorized ... approved Decem- ber 22 , 1944 , and reaffirmed in the acts approved July 24 ... Act of December 22 , 1944 , shall be submitted to the Congress only after ...
... acts also specified the local cooperation required for the projects authorized ... approved Decem- ber 22 , 1944 , and reaffirmed in the acts approved July 24 ... Act of December 22 , 1944 , shall be submitted to the Congress only after ...
Page 6
... Act , which states that whenever the Secretary of the Army determines upon ... approved December 22 , 1944. In accordance with this legislation such ... Act of August 28 , 1937 , as amended , for the removal of accumulated snags and other ...
... Act , which states that whenever the Secretary of the Army determines upon ... approved December 22 , 1944. In accordance with this legislation such ... Act of August 28 , 1937 , as amended , for the removal of accumulated snags and other ...
Page 7
... Act approved June 30 , 1948 , was in a sense . an emergency bill , inasmuch as only projects presenting an emergency or acute condition were considered by the Congres- sional Committees on Public Works . That act contained several ...
... Act approved June 30 , 1948 , was in a sense . an emergency bill , inasmuch as only projects presenting an emergency or acute condition were considered by the Congres- sional Committees on Public Works . That act contained several ...
Page 9
... Act , 1952 , approved October 24 , 1951. Local inter- ests have expended funds in excess of $ 52,000,000 on this project including a cash contribution of approximately $ 6,761,700 for construction by the Corps of Engineers of protective ...
... Act , 1952 , approved October 24 , 1951. Local inter- ests have expended funds in excess of $ 52,000,000 on this project including a cash contribution of approximately $ 6,761,700 for construction by the Corps of Engineers of protective ...
Page 11
... Act with respect to local cooperation ; authorized the plan for flood protection in the Cache River Basin at a partial cost of $ 10,000,000 ; amended the 1928 Flood Control Act to include flood - control improvements in the Parish of Or ...
... Act with respect to local cooperation ; authorized the plan for flood protection in the Cache River Basin at a partial cost of $ 10,000,000 ; amended the 1928 Flood Control Act to include flood - control improvements in the Parish of Or ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet deep 1st sess 2d sess 30 feet Accounts payable anchorage Annual Report Bayou bridge Canal Chief of Engineers Committee resolution Condition at end Cong Connecticut River construction contract contributed funds controlling depths cooperation Cost and financial costs and expenditures Creek cubic yards dredging end of fiscal ending June 30 existing project feet long financial summary 1947 fiscal year 1952 Fiscal year ending fiscal years prior Flood Control Act Geodetic Survey Chart Gulf of Mexico Harbor Act hired labor including fiscal jetties Johns River July 24 June 25 June 30 Lake Lake Okeechobee latest published map levee mean low water miles mouth navigation Operations and results previous projects project dimensions project was authorized Proposed operations Report for 1938 reservoir results during fiscal revised in 1951 River and Harbor Terminal facilities thence total costs Total to June turning basin U. S. Coast wharves width