Hidden fields
Books Books
" States of $2,252,000 for construction; provided that local interests give assurances satisfactory to the Secretary of the Army... "
Report of the Chief of Engineers U.S. Army - Page 2396
by United States. Army. Corps of Engineers - 1948
Full view - About this book

River and Harbor Bill: Hearings Before the Committee on Rivers and Harbors ...

United States. Congress. House. Committee on Rivers and Harbors - Harbors - 1937 - 460 pages
...for new work, with maintenance estimated at $1,000 annually in addition to that now required, and on the condition that local interests give assurances satisfactory to the Secretary of War that they will provide a channel at least 100 feet wide, 14 feet deep, and 400 feet long from the...
Full view - About this book

Waterway Connecting the Tombigbee and Tennessee Rivers, Alabama and ...

United States. Congress. House. Committee on Rivers and Harbors - 1939 - 122 pages
...States of about $66,000,000 and an estimated annual cost of $500,000 for maintenance and operation, subject to the condition that local interests give assurances satisfactory to the Secretary of War that they will — (a) Make at their expense alterations, as required, of existing highways, highway...
Full view - About this book

Waterway Connecting the Tombigbee and Tennessee Rivers, Ala. and Miss ...

United States. Congress. House. Committee on Rivers and Harbors - Tennessee River. [from old catalog] - 1939 - 130 pages
...States of about $66,000,000 and an estimated annual cost of $500,000 for maintenance and operation, subject to the condition that local interests give assurances satisfactory to the Secretary of War that they will — (a) Make at their expense alterations, as required, of existing highways, highway...
Full view - About this book

Construction of Certain Public Works on Rivers and Harbors: Hearings Before ...

United States. Congress. Senate. Committee on Commerce - Excavations (Archaeology) - 1939 - 154 pages
...States of about $66,000,000 and an estimated annual cost of $500,000 for maintenance and operation, subject to the condition that local interests give assurances satisfactory to the Secretary of War that they will (a) Make at their expense alterations, as required, of existing highways, highway...
Full view - About this book

Hearings

United States. Congress. Senate. Committee on Commerce - 1939 - 158 pages
...States of about $66,000,000 and an estimated annual cost of $500,000 for maintenance and operation, subject to the condition that local interests give assurances satisfactory to the Secretary of War that they will (a) Make at their expense alterations, as required, of existing highways, highway...
Full view - About this book

United States Code, Volumes 7-8

United States - Law - 1971 - 1040 pages
...of a highway bridge at State Highway Numbered 42 made necessary by the ditch construction: Provided, That local interests give assurances satisfactory to the Secretary of the Army that they will (1) provide without cost to the United States all lands, easements, and rlghts-of-way necessary for...
Full view - About this book

Oregon and Washington Projects: Hearings Before the Committee on Rivers and ...

United States. Congress. House. Committee on Rivers and Harbors - Harbors - 1941 - 54 pages
...community, estimated at 5, 000 Total estimated annual savings and benefits 16,000 The project is recommended subject to the condition that local interests give assurances satisfactory to the Secretary of War that they will furnish free of cost to the United States all spoil-disposal areas necessary for...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2

United States. Army. Corps of Engineers - Harbors - 1948 - 1600 pages
...7»th Cong., 2d sess.' Specified In act. 1 Completed under previous projects. » Public, No. 3B6. « Contains the latest published map. Local cooperation....interests give assurances satisfactory to the Secretary of War that they will : Provide and maintain a coal dumper and slip so that full utilization can be made...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 1

United States. Army. Corps of Engineers - Harbors - 1948 - 1602 pages
...act of March 2, 1945, are as follows: (a) The yirginia Key improvement is subject to the conditions that local interests give assurances satisfactory...to the Secretary of the Army that they will provide auxiliary channels and suitable airport and harbor terminal facilities at Virginia Key generally in...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2

United States. Army. Corps of Engineers - Harbors - 1946 - 1392 pages
...Project modified by Chief of Engineers June 8, 1896. Local cooperation. — Construction of the project is subject to the condition that local interests give assurances satisfactory to the Secretary of War that they will : (a) Hold and save the United States free from damages due to the construction...
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search
  4. Download EPUB
  5. Download PDF