Report of the Chief of Engineers U.S. Army, Volume 2, Part 1U.S. Government Printing Office, 1948 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 99
Page 1575
... Operations and results during fiscal year . - The work performed during the fiscal year consisted of maintenance and operation of the project . Locks , bridges , buildings , telephone lines , canal banks , roadways and fences were ...
... Operations and results during fiscal year . - The work performed during the fiscal year consisted of maintenance and operation of the project . Locks , bridges , buildings , telephone lines , canal banks , roadways and fences were ...
Page 1615
... Operations and results during fiscal year . - Additional studies and detailed plans have been carried on by hired labor at a cost of $ 18,513.92 . Expenditures were $ 18,401.37 . Condition at end of fiscal year . — Additional studies ...
... Operations and results during fiscal year . - Additional studies and detailed plans have been carried on by hired labor at a cost of $ 18,513.92 . Expenditures were $ 18,401.37 . Condition at end of fiscal year . — Additional studies ...
Page 1626
... results of these studies indicate that construc- tion of Baldhill Reservoir will fulfill an immediate need but would ... Operations and results during fiscal year . - Design , studies for reservoir management and facilities for public ...
... results of these studies indicate that construc- tion of Baldhill Reservoir will fulfill an immediate need but would ... Operations and results during fiscal year . - Design , studies for reservoir management and facilities for public ...
Page 1634
... Operations and results during fiscal year . - Investigation of fee titles and flowage easements , negotiations with the State of Min- nesota ' relative to land acquisition and with the Chicago , Mil- waukee , St. Paul & Pacific Railroad ...
... Operations and results during fiscal year . - Investigation of fee titles and flowage easements , negotiations with the State of Min- nesota ' relative to land acquisition and with the Chicago , Mil- waukee , St. Paul & Pacific Railroad ...
Page 1655
United States. Army. Corps of Engineers. Operations and results during fiscal year . - Work consisted of the operation and care of the lock and dam as required for the passage of small craft at a total cost of $ 6,532.46 , and a total ...
United States. Army. Corps of Engineers. Operations and results during fiscal year . - Work consisted of the operation and care of the lock and dam as required for the passage of small craft at a total cost of $ 6,532.46 , and a total ...
Other editions - View all
Common terms and phrases
accounts receivable allotted during fiscal allotted in July Amount allotted appropriated for completion appropriated to June available for fiscal breakwater Chief of Engineers Committee resolution completion of existing Condition at end Cong construction Control Act approved Cost and financial Cost of maintenance cost of permanent costs to June covered by uncompleted Creek dredging end of fiscal ending June 30 existing project expended in fiscal financial summary Cost fiscal year 1949 Fiscal year ending Flood Control Act Gross amount expended Harbor Act hired labor June 28 Lake Michigan locks and dams low-water datum maintenance to June miles Minus accounts payable Mississippi River Missouri River Ohio River Operations and results operations.-The balance unexpended outer harbor Outstanding liabilities pier profitably expended project depth project dimensions project was authorized Proposed operations.-The balance reservoir results during fiscal revetment riprap River and Harbor Total amount appropriated Total expended total expenditures Unexpended balance Unobligated balance available Wabash River
Popular passages
Page 1764 - That the sum of $12,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers...
Page 2337 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 2024 - That the sum of $25,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers for the repair, restoration, and strengthening of levees and other flood-control works which have been threatened or destroyed by...
Page 1595 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 2396 - States of $2,252,000 for construction; provided that local interests give assurances satisfactory to the Secretary of the Army...
Page 1560 - States all necessary rights-of-way and spoil-disposal areas for new work and subsequent maintenance when and as required, and hold and save the United States free from claims for damages resulting from the improvement.
Page 1617 - Hold and save the United States free from claims for damages due to the construction and maintenance of the improvement...
Page 1742 - That the following sums of money be, and are hereby, appropriated, to be paid out of any money in the Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 1550 - ... in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $100,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1682 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...