Report of the Chief of Engineers U.S. ArmyU.S. Government Printing Office, 1945 |
Other editions - View all
Common terms and phrases
accounts payable June Accounts receivable June allotted in July Amount allotted appropriated to June Arkansas River available June 30 Balance available June balance June 30 Balance unexpended June breakwater Chief of Engineers Columbia River Condition at end Cong construction Cost and financial Cost of maintenance cost of permanent costs to June Creek dredging ending June 30 Exclusive of available existing project financial summary Cost fiscal year 1945 Fiscal year ending Flood Control Act Gross amount expended Harbor Act Harbors Committee resolution hired labor June 28 Lake levee liabilities June 30 locks and dams maintenance to June miles Minus accounts payable Mississippi River Missouri River navigation Ohio River Operations and results outer harbor Outstanding liabilities June payable June 30 pier profitably expended project dimensions receivable June 30 reservoir results during fiscal riprap Rivers and Harbors tion Total amount appropriated Total expended total expenditures Unexpended balance June unexpended June 30 Willamette River
Popular passages
Page 1052 - That the sum of $5,000,000 is authorized to be appropriated as an emergency fund to be allotted by the Secretary of War on the recommendation of the Chief of Engineers, in rescue work or in the repair or maintenance of any flood-control work on any tributaries of the Mississippi River threatened or destroyed by flood including the flood of 1927.
Page 1583 - That the following sums of money be, and are hereby, appropriated, to be paid out of any money in the Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 1013 - ... channels in navigable streams and tributaries thereof when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $25,000 shall be allotted for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1580 - War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 1824 - Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting navigation have been approved by the Chief of Engineers and the Secretary of War.
Page 1714 - The range between mean lower low water and mean higher high water or, in places having only one tide daily, the range between mean low water and mean high water.
Page 1551 - All depths refer to mean lower low water. The tidal range between mean lower low water and mean higher high water is 6.4 feet at the south jetty and 6.7 feet at Eureka.
Page 1847 - The High Contracting Parties agree that it is expedient to limit the diversion of waters from the Niagara river so that the level of Lake Erie and the flow of the stream shall not be appreciably affected. It is the desire of both parties to accomplish this object with the least possible injury to investments which have already been made in the construction of power plants on the United States...
Page 1827 - Engineers include the administration of the Federal laws enacted for the protection and preservation of navigable waters of the United States...
Page 1595 - The tidal range between mean lower low water and mean higher high water is about 1.8 feet and the extreme tidal range is about 4 feet.