Integrated Production, Control Systems: Management, Analysis, and DesignFocuses on the quantitative approaches necessary to computer-integrated manufacturing systems, and integrates major topics covering all phases of the production control cycle: production information processing and flow, production planning, forecasting, material requirements planning and monetary control, and scheduling. This new edition features a compendium set of 11 user-friendly computer programs for the IBM PC that enhance the teaching power of the text, allowing readers to solve real-life problems. Among programs included are growth forecasting, aggregate planning, material requirements planning, lot sizing and inventory control, and limited-resource scheduling. The chapters on scheduling give particularly thorough coverage on this difficult subject. Solutions are clearly presented, with many examples and exercises included in the text. |
From inside the book
Results 1-3 of 61
Page 142
... procedure can result in large numerical errors . Perhaps the strongest drawback is the difficulty in getting management to appreciate this more complex procedure . However , the more serious student should study the procedure for its ...
... procedure can result in large numerical errors . Perhaps the strongest drawback is the difficulty in getting management to appreciate this more complex procedure . However , the more serious student should study the procedure for its ...
Page 147
... procedure is programmed as DIS.BAS on the available diskette . Before going into the procedure , the reader should understand the nature of the product mix situation . Most manufacturing facilities produce several families of product ...
... procedure is programmed as DIS.BAS on the available diskette . Before going into the procedure , the reader should understand the nature of the product mix situation . Most manufacturing facilities produce several families of product ...
Page 360
... procedure that allows resource balancing is as follows : STEP 1 STEP 2 STEP 3 Determine the maximum resource units required by any activity within the project . This is the starting level . Using the allocation procedure , determine the ...
... procedure that allows resource balancing is as follows : STEP 1 STEP 2 STEP 3 Determine the maximum resource units required by any activity within the project . This is the starting level . Using the allocation procedure , determine the ...
Other editions - View all
Common terms and phrases
ACTIM activity aggregate planning algorithm allow analysis approach assembly assigned assumed BASICA batch BEGIN INVENTORY Box-Jenkins calculate carrying costs Chapter completion component considered constraints critical path cycle Data Set determine due date Equation error example problem exponential smoothing factors follows forecasted demand function function key Gantt chart given in Figure GROSS REQUIREMENTS Industrial Engineering input inventory control inventory costs inventory item inventory level KANBAN lead-time Line Balancing line-of-balance linear linear model machine makespan manufacturing master schedule MATERIAL REQUIREMENTS PLANNING maximum mean tardiness minimize minimum needed node operation optimal order costs order quantity output overtime parameters percent period personal computer procedure processor production control quadratic RECPT regression regression analysis resource safety stock sequence shift shown in Figure solution step storage Tandem Computers technique total cost units vendor week