Integrated Production, Control Systems: Management, Analysis, and DesignFocuses on the quantitative approaches necessary to computer-integrated manufacturing systems, and integrates major topics covering all phases of the production control cycle: production information processing and flow, production planning, forecasting, material requirements planning and monetary control, and scheduling. This new edition features a compendium set of 11 user-friendly computer programs for the IBM PC that enhance the teaching power of the text, allowing readers to solve real-life problems. Among programs included are growth forecasting, aggregate planning, material requirements planning, lot sizing and inventory control, and limited-resource scheduling. The chapters on scheduling give particularly thorough coverage on this difficult subject. Solutions are clearly presented, with many examples and exercises included in the text. |
From inside the book
Results 1-3 of 56
Page 167
... items A10 and A20 will be drawn out from inventory and assembled to become item A00 . In turn , item A00 will be placed into inventory to await an order to assemble the final product . In reality , items need not physically enter and leave ...
... items A10 and A20 will be drawn out from inventory and assembled to become item A00 . In turn , item A00 will be placed into inventory to await an order to assemble the final product . In reality , items need not physically enter and leave ...
Page 199
... inventory values do not change greatly from one accounting period to the ... item . The items that contribute to some large percentage of the total ... Inventory policy differs for each category . BATCH A number of units of a particular ...
... inventory values do not change greatly from one accounting period to the ... item . The items that contribute to some large percentage of the total ... Inventory policy differs for each category . BATCH A number of units of a particular ...
Page 200
... inventory item needs to be replenished and by how many items . REORDER LEVEL The specified level below which an inventory item is reordered . Policies that use reorder levels are frequently classified as continuous review policies to ...
... inventory item needs to be replenished and by how many items . REORDER LEVEL The specified level below which an inventory item is reordered . Policies that use reorder levels are frequently classified as continuous review policies to ...
Other editions - View all
Common terms and phrases
ACTIM activity aggregate planning algorithm allow analysis approach assembly assigned assumed BASICA batch BEGIN INVENTORY Box-Jenkins calculate carrying costs Chapter completion component considered constraints critical path cycle Data Set determine due date Equation error example problem exponential smoothing factors follows forecasted demand function function key Gantt chart given in Figure GROSS REQUIREMENTS Industrial Engineering input inventory control inventory costs inventory item inventory level KANBAN lead-time Line Balancing line-of-balance linear linear model machine makespan manufacturing master schedule MATERIAL REQUIREMENTS PLANNING maximum mean tardiness minimize minimum needed node operation optimal order costs order quantity output overtime parameters percent period personal computer procedure processor production control quadratic RECPT regression regression analysis resource safety stock sequence shift shown in Figure solution step storage Tandem Computers technique total cost units vendor week