Integrated Production, Control Systems: Management, Analysis, and DesignFocuses on the quantitative approaches necessary to computer-integrated manufacturing systems, and integrates major topics covering all phases of the production control cycle: production information processing and flow, production planning, forecasting, material requirements planning and monetary control, and scheduling. This new edition features a compendium set of 11 user-friendly computer programs for the IBM PC that enhance the teaching power of the text, allowing readers to solve real-life problems. Among programs included are growth forecasting, aggregate planning, material requirements planning, lot sizing and inventory control, and limited-resource scheduling. The chapters on scheduling give particularly thorough coverage on this difficult subject. Solutions are clearly presented, with many examples and exercises included in the text. |
From inside the book
Results 1-3 of 71
Page 372
... given in Figure 9.13 can now be reevaluated , using a cycle time of 21 , in light of the new procedure . The solution is given in the same order as the given procedural steps . STEP 1 The network was developed in Figure 9.13 . Task ...
... given in Figure 9.13 can now be reevaluated , using a cycle time of 21 , in light of the new procedure . The solution is given in the same order as the given procedural steps . STEP 1 The network was developed in Figure 9.13 . Task ...
Page 378
... provided to the operator than for another work station in the line where the sum of the operation variances is smaller . As an example of stochastic versus deterministic times in line balancing , consider the data given in Figure 9.19 ...
... provided to the operator than for another work station in the line where the sum of the operation variances is smaller . As an example of stochastic versus deterministic times in line balancing , consider the data given in Figure 9.19 ...
Page 383
... number to assign to minimize the monthly mainte- nance costs . 4. Consider the limited - resource network given in Figure 9.24 . If four resource units are available to the project at any period of time , determine the ACTIM minimum ...
... number to assign to minimize the monthly mainte- nance costs . 4. Consider the limited - resource network given in Figure 9.24 . If four resource units are available to the project at any period of time , determine the ACTIM minimum ...
Other editions - View all
Common terms and phrases
ACTIM activity aggregate planning algorithm allow analysis approach assembly assigned assumed BASICA batch BEGIN INVENTORY Box-Jenkins calculate carrying costs Chapter completion component considered constraints critical path cycle Data Set determine due date Equation error example problem exponential smoothing factors follows forecasted demand function function key Gantt chart given in Figure GROSS REQUIREMENTS Industrial Engineering input inventory control inventory costs inventory item inventory level KANBAN lead-time Line Balancing line-of-balance linear linear model machine makespan manufacturing master schedule MATERIAL REQUIREMENTS PLANNING maximum mean tardiness minimize minimum needed node operation optimal order costs order quantity output overtime parameters percent period personal computer procedure processor production control quadratic RECPT regression regression analysis resource safety stock sequence shift shown in Figure solution step storage Tandem Computers technique total cost units vendor week