Technical Record of Design and Construction: Fremont Canyon Powerplant and Power Conduit. Constructed 1956-1961, Missouri River Basin Project, Glendo Unit, Wyo

Front Cover
U.S. Department of the Interior, Bureau of Reclamation, 1963 - Hydroelectric power plants - 295 pages
 

Common terms and phrases

Popular passages

Page 103 - The ships will be built by the Newport News Shipbuilding and Dry Dock Co., Newport News, Virginia.
Page 120 - A mechanical interlock shall be provided in standard truck type switchboard as follows : (1) To prevent the truck being removed from or inserted in the housing unless the oil circuit breaker is in its fully open position.
Page 10 - ... available money? Mr. GOLZE. Yes, sir, that is money made available several years ago and carried over. Chairman HAYDEN. For what are you using that? Mr. GOLZE. For rehabilitation and improvement work on the canal and lateral system. FRENCHMAN-CAMBRIDGE DIVISION, NEBRASKA PROJECT DATA AUTHORIZATION Flood Control Act of 1944 (Public Law 534), 78th Congress, 2d session. LOCATION In southwest Nebraska in Hitchcock, Red Willow, Furnas, and Harlan Counties. Project lands extend from Palisade southeastward...
Page 137 - The total net adjustment in the amount due under the contract by reason of the changes ordered herein is an increase of $139,713.
Page 147 - Steelworkers, the International Union of Operating Engineers, and the International Hod Carriers, Building, and Common Laborers Union.6 Assistant General Counsel Joseph McPherson has said that "the tribe has encouraged all Navajo union members to pay their dues and to maintain themselves in good union standing" and that "the tribe has no objections whatsoever to Navajos belonging to off-reservation labor unions
Page 230 - ... into the foundation. The upper bearing bracket also supports the main exciter, which is directly coupled to the generator shaft. The lower bracket supports the lower guide bearing and the combination air brakes and hydraulic jacks. The stator bore is 7 feet 10-31/64 inches in diameter. This allows clearance for installation or replacement of any part of the generator or turbine located below the stator including the lower guide bearing bracket of the generator. Each generator is excited by a...