Report of the Chief of Engineers U.S. Army, Volume 2, Part 1U.S. Government Printing Office, 1950 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 1439
... maintenance of $ 600.4 Secretary of War granted discretionary authority to permit the future modification of the existing lock and dam improvement No. 2 , near Hastings , Minn . , for development of hydroelectric power in accordance ...
... maintenance of $ 600.4 Secretary of War granted discretionary authority to permit the future modification of the existing lock and dam improvement No. 2 , near Hastings , Minn . , for development of hydroelectric power in accordance ...
Page 1445
... maintenance when and as required ; and provide the necessary floating booms , slips , and servicing facilities open to all on equal terms . ( f ) The provision of a small - boat harbor at Alma , Wis . , is sub- ject to the condition ...
... maintenance when and as required ; and provide the necessary floating booms , slips , and servicing facilities open to all on equal terms . ( f ) The provision of a small - boat harbor at Alma , Wis . , is sub- ject to the condition ...
Page 1446
... maintenance of the improvements ; hold and save the United States free from damage due to the construction and maintenance of the works ; and provide and maintain an ac- cess road , a parking area , and necessary mooring facilities and ...
... maintenance of the improvements ; hold and save the United States free from damage due to the construction and maintenance of the works ; and provide and maintain an ac- cess road , a parking area , and necessary mooring facilities and ...
Page 1449
... Maintenance of channel regulat- ing works , shore protection , and removal and repair of wing dams was performed at a cost of $ 123,393.15 . Sweeping rock cuts . was performed at a cost of $ 7,001.66 . Maintenance of navigation aids ...
... Maintenance of channel regulat- ing works , shore protection , and removal and repair of wing dams was performed at a cost of $ 123,393.15 . Sweeping rock cuts . was performed at a cost of $ 7,001.66 . Maintenance of navigation aids ...
Page 1455
... Maintenance : 971,500 1,000,000 53,300 3,000,000 Channel maintenance dredging 631,500 Surveys , gages , studies , and aids to navigation Maintenance of existing regulating works 112,500 129,000 Snagging ... 13,000 Administration of ...
... Maintenance : 971,500 1,000,000 53,300 3,000,000 Channel maintenance dredging 631,500 Surveys , gages , studies , and aids to navigation Maintenance of existing regulating works 112,500 129,000 Snagging ... 13,000 Administration of ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet additional amount needed Allegheny River Annual Report anticipated allotment breakwater bridge Chief of Engineers Committee resolution completion of existing Condition at end Cong construction Control Act approved Cost and financial Creek cubic yards dredging end of fiscal ending June 30 Estimated additional amount existing project feet deep feet wide financial summary 1946 fiscal year 1951 Fiscal year ending fiscal years prior Flood Control Act Harbor Act hired labor including fiscal July June 28 Lake Michigan latest published map levee Location locks and dams Los Angeles River low-water datum miles Missouri River mouth Ohio River Ohio River Basin Operations and results operations.-The balance unexpended percent complete pier plans and specifications project depth project was authorized Proposed operations.-The balance Public Works Committee reservoir results during fiscal revetment riprap River and Harbor tion total cost Total to June tributaries turning basin United Wabash River
Popular passages
Page 1957 - Reservoirs; subject to the condition that for each local flood-protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will (a) provide without cost to the United States all lands, easements, and rightsof-way necessary for the construction of the project; (6) hold and save the United States free from damages...
Page 1811 - ... in navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $100,000 shall be expended for this purpose for any single tributary from the appropriations for any one fiscal year.
Page 1565 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938...
Page 1469 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1660 - Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or In part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be In accordance with such regulations...
Page 1743 - War is hereby authorized to allot not to exceed $300,000 from any appropriations heretofore or hereafter made for any one fiscal year for improvement of rivers and harbors, for removing accumulated snags and other debris, and for protecting, clearing, and straightening channels in navigable harbors and navigable streams and tributaries thereof, when in the opinion of the Chief of Engineers such work is advisable in the interest of navigation or flood control.
Page 1436 - States free from property damage that may result from the construction or maintenance of the project; (c) provide and maintain without cost to the United States necessary mooring facilities and utilities, including a public landing with suitable supply facilities open to all on equal terms...
Page 1567 - PL 99 is under the direction of the Secretary of the Army and the supervision of the Chief of Engineers.
Page 2140 - ... with the understanding that harbor facilities shall be open to all on equal and reasonable terms. (4) Hold and save the United States free from damages due to construction and maintenance of the works.
Page 1651 - Floodway substantially in accordance with the recommendation of the Chief of Engineers in House Document No.