1. MISSISSIPPI RIVER BETWEEN THE MISSOURI RIVER AN MINNEAPOLIS, MINN. (ROCK ISLAND DISTRICT)

For report on this improvement see page 1437.

2. ILLINOIS AND MISSISSIPPI CANAL, ILL.

Location. This canal connects the Illinois and the Mississipp Rivers, proceeding from a point on the Illinois River about 1 miles from La Salle across the State of Illinois to the Mississipp River at the mouth of Rock River.

Existing project. This provides for the construction of a cana from the Illinois River, near Bureau, running westerly via th Bureau Creek Valley to Rock River, near Colona, thence in th bed of Rock River to the rapids near Milan, and thence to th Mississippi River at the mouth of Rock River, at Rock Island the length of the main line being 75 miles. The feeder, 29.3 mile in length, extends from Rock Falls on Rock River to the summi level of the canal, about 28 miles from the Illinois River.

There are 32 locks in the main canal, described in the follow ing tabulation. There is also a lock and controlling works at th head of the feeder at Rock Falls and a lock in Rock River a Rock Falls connecting the pool of the Government dam with th pool of the power company's dam below. This lock has dimension similar to those in the main canal and cost $75,000.

The estimated cost of new work, revised in 1902, is $8,911, 551.12. The estimated cost for maintenance and operation, re vised in 1950, is $264,000 annually.

The existing project was authorized by the following river an harbor acts:

Acts

Sept. 19, 1890

June 26, 19341

July 3, 1930

Do..

[blocks in formation]

Secretary of War authorized to expend from funds Specified in act.
appropriated and available for maintenance and
improvement of existing river and harbor works
the sum of $25, 235 as a contribution toward the
relocation and reconstruction of the highway
bridge across the Illinois and Mississippi Canal
at Wyanet, Bureau County, Ill., known as bridge
No. 10.

1 Permanent Appropriation Repeal Act.

The latest published map is shown on page 2013 of Annuɛ

Report for 1908.

[graphic][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][subsumed][merged small][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][merged small][subsumed][subsumed][subsumed][merged small][subsumed][merged small][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small]
[graphic]

Table showing features of the Illinois and Mississippi Canal-Continued

LOCKS-Continued

Sterling Dam and dams at Milan, Ill..

ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT

[blocks in formation]

Surveys, flowage, and right-of-way.

Houses..

Excavations, embankments, clearing, fences, etc...

Rock River pool-dredging, removing snags and stumps, etc..

Contribution to Mud Creek special drainage district-dredging. Contributions to State of Illinois-relocation and reconstruction of highway bridge at Wyanet, Ill.. Miscellaneous.

[blocks in formation]

1 Feeder Section.

2 Variable.

Rock River lock is on Rock River at Rock Falls, Ill. It is located in the south end of the Sterling Dam and about 600 feet below the guard lock of the Illinois and Mississippi Canal (feeder section).

$128, 857.97 1, 513, 823. 25 410, 198. 19

76, 974. 69

726, 656. 61

2,956, 451.61
152, 439. 58
8,450.75
25, 235.00
223, 622.78

[blocks in formation]

NOTE.-There are no dams except at the guard lock and lock 30. At the former locality there is a fixed dam across the Rock River, with a movable crest constructed of wood, concrete, and steel; at lock 30 there are crib dams across the north and south channels of Rock River. The north dam has a 60-foot opening and has been superseded by a concrete power dam a short distance below; the south dam adjoining lock 30 has been reinforced with concrete laid in the water

Local cooperation.-Fully complied with.
Terminal facilities.-None.

Operations and results during fiscal year.-The work performed during the fiscal year consisted of maintenance and operation of the project. Locks, bridges, buildings, canal banks, roadways, telephone lines, and fences were repaired; seep ditches and aqueducts were cleaned out; and brush and weeds were cut and burned along the canal right-of-way, all by hired labor. Maintenance dredging at one location in the canal was performed by Government plant and hired labor, a total of 10,362 cubic yards of material having been removed. The costs during the fiscal year were $206,313.22 for operating and care. The expenditures were $216,058.27.

Condition at end of fiscal year.-The existing project was completed in 1918. All locks, dams, aqueducts, buildings, and other appurtenances are in fair condition. Tabulation under paragraph "Existing project" gives data regarding the principal features of construction. At the end of the fiscal year, the controlling depth in the main canal was 3.5 feet (in Rock River section near Milan), and in the feeder canal was 4 feet. These depths have restricted the use of the canal to lightly loaded barges and to pleasure craft. The bottom width of the canal is 52 feet and the width at water surface is 80 feet, except at aqueducts where the width is 40 feet, and at locks, 35 feet. Since April 29, 1948, in order to maintain the maximum possible service with the limited funds available, the canal has been open to all types of navigation only on Thursday and Friday of each week with prior arrangements being made at least one day in advance, and has been open to commercial tows on other weekdays with prior arrangements being made at least seven days in advance of the date passage is desired.

The total cost to June 30, 1950, from regular funds was $10,157,521.49, of which $7,580,143.41 was for new work and $2,577,378.08 was for operating and care. The expenditures were $10,149,893.99. The costs and expenditures from Emergency Relief Funds for removal of snags and stumps in Rock River pool were $25,000, all new work. In addition, the sum of $4,143,282.27 was expended between April 1895 and June 30, 1936, on the operating and care of the works of improvement under the provisions of the permanent indefinite appropriation for such purposes.

Proposed operations. The balance unexpended at the end of the fiscal year, amounting to $20,649.39, plus an anticipated allotment during fiscal year 1951 of $163,000, a total of $183,649.39, will be applied as follows:

[blocks in formation]

183,649.39

The additional sum of $75,000 can be profitably expended during fiscal year 1952, for maintenance, by exclusive of lock operation which is scheduled to be discontinued.

[blocks in formation]

1 Includes $25, 000 Emergency Relief funds.

Includes costs and expenditures of $4, 143, 282. 27 for Operating and Care under the "Permanent Indefinite Appropriation."

3. MILL CREEK AND SOUTH SLOUGH AT MILAN, ILL.

Location. Mill Creek empties into South slough about 1 mil east of the town of Milan, Ill., and 6.5 miles above the mouth o South slough, which empties into the Mississippi River.

Previous projects.-Adopted by the River and Harbor Act o January 21, 1927. (For further details see p. 1132, Annual Re port for 1932, and p. 1081, Annual Report for 1938.)

Existing project. This provides for floodgates in the wall of the Illinois and Mississippi Canal, or other devices for carry ing the flood waters of Mill Creek across the canal right-of-wa into Rock River; for the construction of a levee on the east ban of Mill Creek extending from the Chicago, Rock Island & Pacifi Railroad to the canal embankment; for the construction of a leve on the west bank of Mill Creek and its extension in a wester direction to a connection with Water Street at the point E, show on map of project document; and for the removal of obstruction in Mill Creek and South slough, at an estimated cost of $87,50 for new work. The estimated cost of maintenance, revised in 195 is $10,000 annually.

The existing project was adopted by the River and Harbo Act approved July 3, 1930 (Rivers and Harbors Committee Do 19, 71st Cong., 2d sess.). The latest published map is in the proje document.

Local cooperation.-Fully complied with.
Terminal facilities.-None.

Operations and results during fiscal year.-Hired labor forc cut brush and willows on the banks of Mill Creek and Sout slough, performed minor dredging and snagging, and operate spillway gates.

An allotment of $35,000 in addition to an allotment of $2,00 for regular maintenance, was made during the fiscal year f maintenance operations in cleaning out accumulated silt from t channels of Mill Creek and South slough to relieve flood hazar at the village of Milan, Ill. Preparation of contract plans and spe fications, by hired labor, was completed during the fiscal year.