Navajo Dam and Reservoir, Issue 221966 - Dams - 241 pages |
From inside the book
Results 1-5 of 83
Page xv
... Figures 1," 27 and 3" show the location of the dam, the reservoir area, and a map of the Colorado River Storage project ... shown on figure 4. The drainage area at the damsite is 3, 190 square miles. 3. History and Settlement of Basin ...
... Figures 1," 27 and 3" show the location of the dam, the reservoir area, and a map of the Colorado River Storage project ... shown on figure 4. The drainage area at the damsite is 3, 190 square miles. 3. History and Settlement of Basin ...
Page xxiv
... Figures 1 , 2 , and 3 show the location of the dam , the reservoir area , and a map of the Colorado River Storage ... shown on figure 4 . The drainage area at the damsite is 3 , 190 square miles . 3 . History and Settlement of Basin ...
... Figures 1 , 2 , and 3 show the location of the dam , the reservoir area , and a map of the Colorado River Storage ... shown on figure 4 . The drainage area at the damsite is 3 , 190 square miles . 3 . History and Settlement of Basin ...
Page xxiv
... shown on figure 5. 11. Damsite Geology. T^e_damsite_2S_located in the ^ Eocene Wasatch. formatipnai_a point where the- river, valley narrows. Topographically it is the»most favorable., site in. the area. The river, flowing south .just ...
... shown on figure 5. 11. Damsite Geology. T^e_damsite_2S_located in the ^ Eocene Wasatch. formatipnai_a point where the- river, valley narrows. Topographically it is the»most favorable., site in. the area. The river, flowing south .just ...
Page 13
... shown on figure 7. IFTias a height of -558~?eet a5ove"stfearnbed and 402 feet above~ttre~ deepest excavation. The crest width of ''the dam is T30Teet~ahd the crest length is 3, 64b feet at crest elevatidn"61D8. 0, and the maximunTbase ...
... shown on figure 7. IFTias a height of -558~?eet a5ove"stfearnbed and 402 feet above~ttre~ deepest excavation. The crest width of ''the dam is T30Teet~ahd the crest length is 3, 64b feet at crest elevatidn"61D8. 0, and the maximunTbase ...
Page 15
... shown on figure 11 . Guiding principles for preparing the design distribution list were : ( 1 ) Topsoil and soil ... indicated on preliminary design drawings was not included in this contract and will not be initiated until the need for ...
... shown on figure 11 . Guiding principles for preparing the design distribution list were : ( 1 ) Topsoil and soil ... indicated on preliminary design drawings was not included in this contract and will not be initiated until the need for ...
Contents
90 | |
133 | |
139 | |
145 | |
173 | |
176 | |
179 | |
180 | |
64 | |
69 | |
71 | |
72 | |
73 | |
74 | |
75 | |
79 | |
82 | |
84 | |
85 | |
87 | |
185 | |
185 | |
185 | |
186 | |
187 | |
188 | |
189 | |
190 | |
191 | |
192 | |
193 | |
196 | |
Common terms and phrases
abutment allowable anchor approximately assumed auxiliary outlet backfill borrow area bulkhead capacity channel close completed concrete considered consists construction contract contractor crest cubic DETAIL discharge diversion downstream drain drainage DRAWINGS drilled elevation embankment equipment excavation feet Figure flood floor flow foundation furnished gate chamber gate structure gravel grout head hoist holes hollow-jet valve horizontal hydraulic inch inlet installed intake structure joints load located loss main outlet materials maximum Navajo Dam normal NOTES operations outlet works tunnel percent piezometer pipe placed PLAN plant position pounds per square pressure PROJECT pump reinforcement reservoir ring ring-follower gate River rock SAN JUAN sand sandstone seals second-feet SECTION shaft shale shown on figure specifications spillway square inch station steel stilling basin storage stresses surface tests trashrack unit upstream vertical volve Zone
Popular passages
Page 30 - Standard Specifications for Highway Bridges, published by the American Association of State Highway and Transportation Officials (AASHTO), are applied The AASHTO Specification recognizes two forms of truck loading: the H loading, and the HS loading.
Page 91 - ... potential of Federal water-control projects, principally those proposed by the Bureau of Reclamation. We have performed generally similar work for the Corps of Engineers when requested. In recent years the National Park Service has performed recreation resource planning at water-control projects under a memorandum of agreement between the Bureau of Reclamation and the National Park Service of April 5, 1955. A copy of the agreement is attached. Pertinent portions of the agreement are : 3. The...
Page 51 - Ibs. per square inch, one high pressure air compressor having a capacity of 1,600 cubic feet of free air per minute at a pressure of 125 Ibs. per square inch, and four hydraulic pumps with an accumulator, each developing 5,000 Ibs. per square inch. The erection of the power-house was commenced on June 28, 1922, and is now more than half completed. The plant is to be electrically operated, the current being furnished by three independent...