Navajo Dam and Reservoir, Issue 221966 - Dams - 241 pages |
From inside the book
Results 1-5 of 36
Page 9
... Reinforcement 179 141. Anchor bars 179 142. Tile drains 180 CHAPTER VUL Construction —INSTALLATION OF METALWORK AND MACHINERY 143. General 181 144. Elliptical intake bulkhead 181 145. Tandem outlet gate 181 146. 6- by 13-foot fixed ...
... Reinforcement 179 141. Anchor bars 179 142. Tile drains 180 CHAPTER VUL Construction —INSTALLATION OF METALWORK AND MACHINERY 143. General 181 144. Elliptical intake bulkhead 181 145. Tandem outlet gate 181 146. 6- by 13-foot fixed ...
Page vii
... Reinforcement 179 141. Anchor bars 179 142. Tile drains 180 CHAPTER VIE. Construction —INSTALLATION OF METALWORK AND MACHINERY 143. General 181 144. Elliptical intake bulkhead 181 145. Tandem outlet gate 181 146. 6- by 13-foot fixed ...
... Reinforcement 179 141. Anchor bars 179 142. Tile drains 180 CHAPTER VIE. Construction —INSTALLATION OF METALWORK AND MACHINERY 143. General 181 144. Elliptical intake bulkhead 181 145. Tandem outlet gate 181 146. 6- by 13-foot fixed ...
Page ix
... reinforcement 53 28. Outlet works plan, profile, and sections 57 29. Main outlet works intake structure 59 30. Main outlet works gate structure and shaft 60 31. Main outlet works manifold block, tunnel access house, and 30-inch hollow ...
... reinforcement 53 28. Outlet works plan, profile, and sections 57 29. Main outlet works intake structure 59 30. Main outlet works gate structure and shaft 60 31. Main outlet works manifold block, tunnel access house, and 30-inch hollow ...
Page x
... reinforcement steel and grouting anchor bars for floor slab of spillway stilling basin 170 85. Construction of spillway bridge as seen from left downstream side .... 171 86. Placing concrete in spillway cutoff trench 171 87. Concreting ...
... reinforcement steel and grouting anchor bars for floor slab of spillway stilling basin 170 85. Construction of spillway bridge as seen from left downstream side .... 171 86. Placing concrete in spillway cutoff trench 171 87. Concreting ...
Page xvii
... Reinforcement 179 141. Anchor bars 179 142. Tile drains 180 CHAPTER VUL Construction —INSTALLATION OF METAL WORK AND MACHINERY 143. General 181 144. Elliptical intake bulkhead 181 145. Tandem outlet gate 181 146. 6- by 13-foot fixed ...
... Reinforcement 179 141. Anchor bars 179 142. Tile drains 180 CHAPTER VUL Construction —INSTALLATION OF METAL WORK AND MACHINERY 143. General 181 144. Elliptical intake bulkhead 181 145. Tandem outlet gate 181 146. 6- by 13-foot fixed ...
Contents
90 | |
133 | |
139 | |
145 | |
173 | |
176 | |
179 | |
180 | |
64 | |
69 | |
71 | |
72 | |
73 | |
74 | |
75 | |
79 | |
82 | |
84 | |
85 | |
87 | |
185 | |
185 | |
185 | |
186 | |
187 | |
188 | |
189 | |
190 | |
191 | |
192 | |
193 | |
196 | |
Common terms and phrases
abutment allowable anchor approximately assumed auxiliary outlet backfill borrow area bulkhead capacity channel close completed concrete considered consists construction contract contractor crest cubic DETAIL discharge diversion downstream drain drainage DRAWINGS drilled elevation embankment equipment excavation feet Figure flood floor flow foundation furnished gate chamber gate structure gravel grout head hoist holes hollow-jet valve horizontal hydraulic inch inlet installed intake structure joints load located loss main outlet materials maximum Navajo Dam normal NOTES operations outlet works tunnel percent piezometer pipe placed PLAN plant position pounds per square pressure PROJECT pump reinforcement reservoir ring ring-follower gate River rock SAN JUAN sand sandstone seals second-feet SECTION shaft shale shown on figure specifications spillway square inch station steel stilling basin storage stresses surface tests trashrack unit upstream vertical volve Zone
Popular passages
Page 30 - Standard Specifications for Highway Bridges, published by the American Association of State Highway and Transportation Officials (AASHTO), are applied The AASHTO Specification recognizes two forms of truck loading: the H loading, and the HS loading.
Page 91 - ... potential of Federal water-control projects, principally those proposed by the Bureau of Reclamation. We have performed generally similar work for the Corps of Engineers when requested. In recent years the National Park Service has performed recreation resource planning at water-control projects under a memorandum of agreement between the Bureau of Reclamation and the National Park Service of April 5, 1955. A copy of the agreement is attached. Pertinent portions of the agreement are : 3. The...
Page 51 - Ibs. per square inch, one high pressure air compressor having a capacity of 1,600 cubic feet of free air per minute at a pressure of 125 Ibs. per square inch, and four hydraulic pumps with an accumulator, each developing 5,000 Ibs. per square inch. The erection of the power-house was commenced on June 28, 1922, and is now more than half completed. The plant is to be electrically operated, the current being furnished by three independent...