Navajo Dam and Reservoir, Issue 221966 - Dams - 241 pages |
From inside the book
Results 1-5 of 25
Page 32
... close of the 1961 construction season, high pore-water pressures were recorded for these tips. When embankment placement was resumed in April 1962, pressures from the tips at elevation 5930 continued to rise. With the increased ...
... close of the 1961 construction season, high pore-water pressures were recorded for these tips. When embankment placement was resumed in April 1962, pressures from the tips at elevation 5930 continued to rise. With the increased ...
Page 32
... close of the 1961 construction season, high pore-water pressures were recorded for these tips. When embankment placement was resumed in April 1962, pressures from the tips at elevation 5930 continued to rise. With the increased ...
... close of the 1961 construction season, high pore-water pressures were recorded for these tips. When embankment placement was resumed in April 1962, pressures from the tips at elevation 5930 continued to rise. With the increased ...
Page 32
... close of the 1961 construction season, high pore-water pressures were recorded for these tips. When embankment placement was resumed in April 1962, pressures from the tips at elevation 5930 continued to rise. With the increased ...
... close of the 1961 construction season, high pore-water pressures were recorded for these tips. When embankment placement was resumed in April 1962, pressures from the tips at elevation 5930 continued to rise. With the increased ...
Page 59
... close shut off gote , backroll & pipe with concrete , Cut off wire rope at end of pipe , install blind flanges and grout pipe for closure of the % Dypos5 Dipe see Dwo » 9 - 159 Concrete lunes conform to minimum encovotron 15 6 E1573977 ...
... close shut off gote , backroll & pipe with concrete , Cut off wire rope at end of pipe , install blind flanges and grout pipe for closure of the % Dypos5 Dipe see Dwo » 9 - 159 Concrete lunes conform to minimum encovotron 15 6 E1573977 ...
Page 64
... close regulation of small releases — at first stipulated as up to 250 second-feet but later raised to 350 second-feet because of increased industrial demands. This discharge was computed at minimum reservoir water surface elevation ...
... close regulation of small releases — at first stipulated as up to 250 second-feet but later raised to 350 second-feet because of increased industrial demands. This discharge was computed at minimum reservoir water surface elevation ...
Contents
90 | |
133 | |
139 | |
145 | |
173 | |
176 | |
179 | |
180 | |
64 | |
69 | |
71 | |
72 | |
73 | |
74 | |
75 | |
79 | |
82 | |
84 | |
85 | |
87 | |
185 | |
185 | |
185 | |
186 | |
187 | |
188 | |
189 | |
190 | |
191 | |
192 | |
193 | |
196 | |
Common terms and phrases
abutment allowable anchor approximately assumed auxiliary outlet backfill borrow area bulkhead capacity channel close completed concrete considered consists construction contract contractor crest cubic DETAIL discharge diversion downstream drain drainage DRAWINGS drilled elevation embankment equipment excavation feet Figure flood floor flow foundation furnished gate chamber gate structure gravel grout head hoist holes hollow-jet valve horizontal hydraulic inch inlet installed intake structure joints load located loss main outlet materials maximum Navajo Dam normal NOTES operations outlet works tunnel percent piezometer pipe placed PLAN plant position pounds per square pressure PROJECT pump reinforcement reservoir ring ring-follower gate River rock SAN JUAN sand sandstone seals second-feet SECTION shaft shale shown on figure specifications spillway square inch station steel stilling basin storage stresses surface tests trashrack unit upstream vertical volve Zone
Popular passages
Page 30 - Standard Specifications for Highway Bridges, published by the American Association of State Highway and Transportation Officials (AASHTO), are applied The AASHTO Specification recognizes two forms of truck loading: the H loading, and the HS loading.
Page 91 - ... potential of Federal water-control projects, principally those proposed by the Bureau of Reclamation. We have performed generally similar work for the Corps of Engineers when requested. In recent years the National Park Service has performed recreation resource planning at water-control projects under a memorandum of agreement between the Bureau of Reclamation and the National Park Service of April 5, 1955. A copy of the agreement is attached. Pertinent portions of the agreement are : 3. The...
Page 51 - Ibs. per square inch, one high pressure air compressor having a capacity of 1,600 cubic feet of free air per minute at a pressure of 125 Ibs. per square inch, and four hydraulic pumps with an accumulator, each developing 5,000 Ibs. per square inch. The erection of the power-house was commenced on June 28, 1922, and is now more than half completed. The plant is to be electrically operated, the current being furnished by three independent...