Page 11
... truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad , Highway , and County Road Relocation Studies . ( a ) Railroad . -- Relocation studies for the Chicago , Burlington and Quincy Railroad were started in 1947 . These ...
... truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad , Highway , and County Road Relocation Studies . ( a ) Railroad . -- Relocation studies for the Chicago , Burlington and Quincy Railroad were started in 1947 . These ...
Page 55
... truck overturning . ( 2 ) A steel bin falling on a welder . ( 3 ) A carpenter falling from a high form . A. Contracts - 37. Major Construction Contracts . The construction of Trenton Dam and re- location of railroad and highway was ...
... truck overturning . ( 2 ) A steel bin falling on a welder . ( 3 ) A carpenter falling from a high form . A. Contracts - 37. Major Construction Contracts . The construction of Trenton Dam and re- location of railroad and highway was ...
Page 59
... Trucks Flatbed trucks Dump trucks Truck End - dump trucks End - dump trucks Bottom - dump trucks Bottom - dump trucks Water tank trucks Transit mixer trucks Fuel tank trailers Tractors Excavating machine Shop cranes Scrapers Motor ...
... Trucks Flatbed trucks Dump trucks Truck End - dump trucks End - dump trucks Bottom - dump trucks Bottom - dump trucks Water tank trucks Transit mixer trucks Fuel tank trailers Tractors Excavating machine Shop cranes Scrapers Motor ...
Page 62
... 30 - cubic - yard truck . P328-701-2801 , June 12 , 1951 . ground - water table . The pumps handled an average. 62 Auxiliary cutoff trench excavation completed bedrock 28 A side-elevating loader in operation in South borrow area.
... 30 - cubic - yard truck . P328-701-2801 , June 12 , 1951 . ground - water table . The pumps handled an average. 62 Auxiliary cutoff trench excavation completed bedrock 28 A side-elevating loader in operation in South borrow area.
Page 63
... trucks , having capacities ranging from 13 to 17 cubic yards . Fine sand and silt were the principal constituents of the excavated material . The dragline and shovel method of excavating yielded a satisfactory mixture . During the ...
... trucks , having capacities ranging from 13 to 17 cubic yards . Fine sand and silt were the principal constituents of the excavated material . The dragline and shovel method of excavating yielded a satisfactory mixture . During the ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation