Trenton Dam: Constructed 1949-1953 |
From inside the book
Page 1
... cost , and necessity for a protective dike at the head of the lake for the town of Trenton . Alternative sites west ... unit weight and varies considerably in density because of the haphazard arrangement of particles and inconsistent ...
... cost , and necessity for a protective dike at the head of the lake for the town of Trenton . Alternative sites west ... unit weight and varies considerably in density because of the haphazard arrangement of particles and inconsistent ...
Page 14
... Unit costs were then applied to excavation , structures , and other items . ( c ) County Road . -- Nine miles of county road south of Swanson Reservoir were re- located . This relocation work involved the preparation of design data ...
... Unit costs were then applied to excavation , structures , and other items . ( c ) County Road . -- Nine miles of county road south of Swanson Reservoir were re- located . This relocation work involved the preparation of design data ...
Page 84
... cost to the Government $ 287 495 701C - 03-5 Cultivation of trees and shrubs , Swanson Lake-- Forrest Quick 466 701C ... unit on furnace in caretaker's residence -- Stratton Supply Co. 701C - 330 ( SF ) 701C - 357 ( SF ) Construction of ...
... cost to the Government $ 287 495 701C - 03-5 Cultivation of trees and shrubs , Swanson Lake-- Forrest Quick 466 701C ... unit on furnace in caretaker's residence -- Stratton Supply Co. 701C - 330 ( SF ) 701C - 357 ( SF ) Construction of ...
Page 90
... Unit cost Total cost 1 Diversion and care of river during construction and unwatering foundations Lump sum 5,000.00 2 Excavation , common , strip- ping borrow areas 127 , 150 cu yd . $ 0.18 22,887.00 3 Excavation , common , for ...
... Unit cost Total cost 1 Diversion and care of river during construction and unwatering foundations Lump sum 5,000.00 2 Excavation , common , strip- ping borrow areas 127 , 150 cu yd . $ 0.18 22,887.00 3 Excavation , common , for ...
Page 91
... Unit cost Total cost 1 Diversion and care of river during construction and unwatering foundations A. Excavate new main diver- sion channel and con- struct side dikes Lump 100 % sum 64,000 $ 64,000.00 B. Construct four timber groins on ...
... Unit cost Total cost 1 Diversion and care of river during construction and unwatering foundations A. Excavate new main diver- sion channel and con- struct side dikes Lump 100 % sum 64,000 $ 64,000.00 B. Construct four timber groins on ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation