Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 37
Page iii
... steel 52 . Forms 53 . 54 . 55 . 56 . 57 . Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting D. Gate Installations 58 . 59 . High - pressure gates Radial gates ( a ) Painting 255 75 75 ...
... steel 52 . Forms 53 . 54 . 55 . 56 . 57 . Batching and mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting D. Gate Installations 58 . 59 . High - pressure gates Radial gates ( a ) Painting 255 75 75 ...
Page 9
... steel rod from bottom of jet hole Groundwater elevation at given date . TP4 TPS TP6 E1 27041 EL 2 707 2 140 SILT , fine , sandy SAND , clean SILT , sandy 34 3-40 El 26970 SILT , sandy SAND fine , clean TP7 El 27627 T- SAND , silty ...
... steel rod from bottom of jet hole Groundwater elevation at given date . TP4 TPS TP6 E1 27041 EL 2 707 2 140 SILT , fine , sandy SAND , clean SILT , sandy 34 3-40 El 26970 SILT , sandy SAND fine , clean TP7 El 27627 T- SAND , silty ...
Page 22
... steel radial gates for flood control and two 6- by 7.5- foot gated sluiceways for river control . A 266 - foot - wide channel extends from the end of the spillway stilling basin a distance of about 1 mile downstream to the river channel ...
... steel radial gates for flood control and two 6- by 7.5- foot gated sluiceways for river control . A 266 - foot - wide channel extends from the end of the spillway stilling basin a distance of about 1 mile downstream to the river channel ...
Page 27
... steel platform , spanning the piers beneath the highway bridge , is provided for gate hoisting machinery . River outlets are located at the base of the intermediate piers and pass through the crest structure . To keep hydraulic losses ...
... steel platform , spanning the piers beneath the highway bridge , is provided for gate hoisting machinery . River outlets are located at the base of the intermediate piers and pass through the crest structure . To keep hydraulic losses ...
Page 29
... steel Crown El 2793 17 at supports- Expansion joint " El 2790.00 Contraction joint- ៩ ' · 6 " Fillet Roller E1.2787.52 El 2785 00 Float well Bearing block- 9 at crown -6 " Fillet --Painted joint Sheet metal : plate- El 278300 Pier ...
... steel Crown El 2793 17 at supports- Expansion joint " El 2790.00 Contraction joint- ៩ ' · 6 " Fillet Roller E1.2787.52 El 2785 00 Float well Bearing block- 9 at crown -6 " Fillet --Painted joint Sheet metal : plate- El 278300 Pier ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation