Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 31
Page 1
... shown in figure 1 . The dam is one of the key storage and flood control features of the Missouri River Basin project . Among the benefits derived from the construction of Trenton Dam are flood control , diversion for irrigation ...
... shown in figure 1 . The dam is one of the key storage and flood control features of the Missouri River Basin project . Among the benefits derived from the construction of Trenton Dam are flood control , diversion for irrigation ...
Page 5
... shown as appendix A , and pay item breakdowns for the two principal specifications , Nos . 2689 and 3047 , are shown as appendixes B and C , respectively . Direct Costs Land rights Major construction contracts Minor construction ...
... shown as appendix A , and pay item breakdowns for the two principal specifications , Nos . 2689 and 3047 , are shown as appendixes B and C , respectively . Direct Costs Land rights Major construction contracts Minor construction ...
Page 7
... shown on figure 4 . An examination of the geologic profiles indicated a valley fill of alluvium to a depth of about 40 feet overlying the Pierre shale . Loess deposits covered the alluvium on the gentle slopes of the right abutment . A ...
... shown on figure 4 . An examination of the geologic profiles indicated a valley fill of alluvium to a depth of about 40 feet overlying the Pierre shale . Loess deposits covered the alluvium on the gentle slopes of the right abutment . A ...
Page 8
... shown on Dwg 00020N RIVER- H3 JH14 DH3 сне JH34 -JH36 . JHTO JH33 JHI13 JH4 JH42 JH43 JH44 JH45 JH46 JN74 HTT CH33 JHIS JH53 JM75 JH76 CH35 CH36 JH5 CH34 CH37 CH38 JHIIS CH CHAI JHIG CH42 CH4O JHI Main cutoff trench UHI7 JHE JHIOS WELL ...
... shown on Dwg 00020N RIVER- H3 JH14 DH3 сне JH34 -JH36 . JHTO JH33 JHI13 JH4 JH42 JH43 JH44 JH45 JH46 JN74 HTT CH33 JHIS JH53 JM75 JH76 CH35 CH36 JH5 CH34 CH37 CH38 JHIIS CH CHAI JHIG CH42 CH4O JHI Main cutoff trench UHI7 JHE JHIOS WELL ...
Page 10
... shown in hypo section , drawing 328-0-1002 , and general sections , drawings 328-0-1001 and 1002 AMZK ANZO 1800 AH324 AH309 AN 313 AM327 AN325 ANDIS 100- AM314 AH 326 ELEVATION 2800 A.H.261 EL.2789 5 2790 100,000 SILT , with very fine ...
... shown in hypo section , drawing 328-0-1002 , and general sections , drawings 328-0-1001 and 1002 AMZK ANZO 1800 AH324 AH309 AN 313 AM327 AN325 ANDIS 100- AM314 AH 326 ELEVATION 2800 A.H.261 EL.2789 5 2790 100,000 SILT , with very fine ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation