Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 52
Page
... section : 126 feet Crest : Elevation 2743.00 Maximum discharge : 126 , 500 second- feet at water surface elevation 2785.6 ( as determined by model studies ) Gates : Three , 42 by 30 feet Stilling basin : Reinforced concrete with ...
... section : 126 feet Crest : Elevation 2743.00 Maximum discharge : 126 , 500 second- feet at water surface elevation 2785.6 ( as determined by model studies ) Gates : Three , 42 by 30 feet Stilling basin : Reinforced concrete with ...
Page
... Commissioner and Chief Engineer . Acknowledgment is gratefully made to the designers and field personnel whose contributions formed the basis for this work . CONTENTS CHAPTER I -- INTRODUCTION Section 1 . General description.
... Commissioner and Chief Engineer . Acknowledgment is gratefully made to the designers and field personnel whose contributions formed the basis for this work . CONTENTS CHAPTER I -- INTRODUCTION Section 1 . General description.
Page i
... Section 1 . General description 2 . History and authorization 3 . Alternative sites 4 . Geology 5 . Cost CHAPTER II -- INVESTIGATIONS Page 1 5 11115 6 . General 7 . Construction materials ( a ) Earth materials 8 . ( b ) Riprap and rock ...
... Section 1 . General description 2 . History and authorization 3 . Alternative sites 4 . Geology 5 . Cost CHAPTER II -- INVESTIGATIONS Page 1 5 11115 6 . General 7 . Construction materials ( a ) Earth materials 8 . ( b ) Riprap and rock ...
Page ii
Constructed 1949-1953 United States. Bureau of Reclamation. Section 27 . 28 . 29 . 30 . 31 . 32 . 33 . CONTENTS ( Continued ) ( a ) Loadings ( b ) Design considerations ( c ) Trashracks ... Section 48 . 49 . Earth fill placement CONTENTS ( ...
Constructed 1949-1953 United States. Bureau of Reclamation. Section 27 . 28 . 29 . 30 . 31 . 32 . 33 . CONTENTS ( Continued ) ( a ) Loadings ( b ) Design considerations ( c ) Trashracks ... Section 48 . 49 . Earth fill placement CONTENTS ( ...
Page iii
Constructed 1949-1953 United States. Bureau of Reclamation. Section 48 . 49 . Earth fill placement CONTENTS ( Continued ) Page ( a ) Control Crushed rock and riprap placement 50 . Materials ( a ) Sand ( b ) Coarse aggregate ( c ) Cement ...
Constructed 1949-1953 United States. Bureau of Reclamation. Section 48 . 49 . Earth fill placement CONTENTS ( Continued ) Page ( a ) Control Crushed rock and riprap placement 50 . Materials ( a ) Sand ( b ) Coarse aggregate ( c ) Cement ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation