Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 27
Page i
... rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 7 11 11 11 11 14 བབབ CHAPTER III -- DESIGN Hydraulic requirements 10 . Flood routing ( a ) Tailwater ...
... rock - blanket materials Railroad , highway , and county road relocation studies ( a ) Railroad ( b ) Highway ( c ) County road 7 11 11 11 11 14 བབབ CHAPTER III -- DESIGN Hydraulic requirements 10 . Flood routing ( a ) Tailwater ...
Page iii
... rock and riprap placement 50 . Materials ( a ) Sand ( b ) Coarse aggregate ( c ) Cement 5565 66 C. Concrete 66 66 66 67 67 69 69 71 71 74 74 74 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . Batching and mixing Control ...
... rock and riprap placement 50 . Materials ( a ) Sand ( b ) Coarse aggregate ( c ) Cement 5565 66 C. Concrete 66 66 66 67 67 69 69 71 71 74 74 74 51 . Reinforcement steel 52 . Forms 53 . 54 . 55 . 56 . 57 . Batching and mixing Control ...
Page v
... rock on an 18 - inch layer of crushed rock blanket 64 31 Panels for forming spillway wall sections 68 33333 32 Form for the 5.5 - foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading ...
... rock on an 18 - inch layer of crushed rock blanket 64 31 Panels for forming spillway wall sections 68 33333 32 Form for the 5.5 - foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading ...
Page 7
... rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth Materials . --The flood plain area was investigated as a possible source of earth materials suitable for construction . The ...
... rock blanket For dam , cu . yd . 95,000 20,000 For relocated railroad fill , cu . yd . ( a ) Earth Materials . --The flood plain area was investigated as a possible source of earth materials suitable for construction . The ...
Page 11
... rock - blanket of the dam . Rock obtained from the Golden quarry required blasting and processing at the quarry , shipment by railroad to Trenton , Nebr . , and haul- ing by truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad ...
... rock - blanket of the dam . Rock obtained from the Golden quarry required blasting and processing at the quarry , shipment by railroad to Trenton , Nebr . , and haul- ing by truck for a distance of 2-1 / 2 miles to the dam . 8. Railroad ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation