Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 53
Page
... River Basin Project Denver , Colorado 1957 TRENTON DAM Missouri River Basin Project-- Nebraska AERIAL VIEW OF.
... River Basin Project Denver , Colorado 1957 TRENTON DAM Missouri River Basin Project-- Nebraska AERIAL VIEW OF.
Page
... River , about 2-1 / 2 miles west of Trenton , Nebr . Constructed : 1949-1953 Water supply : Republican River Drainage area : 4,003 square miles Maximum flood : 200,000 second- feet ( May 31 , 1935 ) Average yearly flow : 211 second ...
... River , about 2-1 / 2 miles west of Trenton , Nebr . Constructed : 1949-1953 Water supply : Republican River Drainage area : 4,003 square miles Maximum flood : 200,000 second- feet ( May 31 , 1935 ) Average yearly flow : 211 second ...
Page
... river outlets , canal outlet works , and railroad structures are included in chapter III . Chapter IV contains discussions on contract administration and survey work . All phases of construction are discussed in chapter V. Chapter VI is ...
... river outlets , canal outlet works , and railroad structures are included in chapter III . Chapter IV contains discussions on contract administration and survey work . All phases of construction are discussed in chapter V. Chapter VI is ...
Page i
... River diversion plan 13 . General 15 15 17 17 17 A. Arrangement of Structures 22 B. Dam 14 . Embankment ( a ) Upstream slope ( b ) Downstream slope 23 ( c ) Crest and camber details 23 2222 C. Spillway and River Outlets 15 . General 16 ...
... River diversion plan 13 . General 15 15 17 17 17 A. Arrangement of Structures 22 B. Dam 14 . Embankment ( a ) Upstream slope ( b ) Downstream slope 23 ( c ) Crest and camber details 23 2222 C. Spillway and River Outlets 15 . General 16 ...
Page ii
... River diversion 43 . Construction equipment A. Excavation 59 69 44 . Foundation area 45 . Main cutoff trench 46 . Auxiliary cutoff trench and other excavation work B. Embankment Operations 47 . Borrow area operation ( a ) South borrow ...
... River diversion 43 . Construction equipment A. Excavation 59 69 44 . Foundation area 45 . Main cutoff trench 46 . Auxiliary cutoff trench and other excavation work B. Embankment Operations 47 . Borrow area operation ( a ) South borrow ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation