Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 36
Page i
... Spillway bridge River outlet trashracks High - pressure gates 27 27 32 32 32 33 33 34 34 34 34 wwwww . 37 37 37 39 39 D. Canal Outlet Works 3228 25 . 26 . General Intake structure 114 41 41 Section 27 . 28 . 29 . 30 . 31 i.
... Spillway bridge River outlet trashracks High - pressure gates 27 27 32 32 32 33 33 34 34 34 34 wwwww . 37 37 37 39 39 D. Canal Outlet Works 3228 25 . 26 . General Intake structure 114 41 41 Section 27 . 28 . 29 . 30 . 31 i.
Page ii
... Pressure conduit ( a ) Loadings Emergency gate chamber Horseshoe conduit ( a ) Loadings ( b ) Design considerations Outlet pipe Control house and stilling well ( a ) Design considerations High - pressure gates Miscellaneous equipment E ...
... Pressure conduit ( a ) Loadings Emergency gate chamber Horseshoe conduit ( a ) Loadings ( b ) Design considerations Outlet pipe Control house and stilling well ( a ) Design considerations High - pressure gates Miscellaneous equipment E ...
Page iii
... pressure gates Radial gates ( a ) Painting 255 75 75 75 CHAPTER VI --- TEST INSTALLATIONS 60 . Purpose 61 . Piezometer installation 62 . Settlement installations 822 77 77 APPENDIXES 83 A. Cost summary B. C. Pay item breakdown for ...
... pressure gates Radial gates ( a ) Painting 255 75 75 75 CHAPTER VI --- TEST INSTALLATIONS 60 . Purpose 61 . Piezometer installation 62 . Settlement installations 822 77 77 APPENDIXES 83 A. Cost summary B. C. Pay item breakdown for ...
Page iv
... pressure gate 40 18 Canal outlet works -- Plan and sections 42 19 Canal outlet works discharge curves 44 20 Pressure conduit of canal outlet works -- Compacting backfill around conduit 45 21 Canal outlet works -- Gate chambers and ...
... pressure gate 40 18 Canal outlet works -- Plan and sections 42 19 Canal outlet works discharge curves 44 20 Pressure conduit of canal outlet works -- Compacting backfill around conduit 45 21 Canal outlet works -- Gate chambers and ...
Page 5
... pressures develop after application of a load . 5. Cost . - The following tabulation gives the cost of construction of Trenton Dam and Reservoir and the railroad and highway relocations , by major groupings , as of August 28 , 1957. A ...
... pressures develop after application of a load . 5. Cost . - The following tabulation gives the cost of construction of Trenton Dam and Reservoir and the railroad and highway relocations , by major groupings , as of August 28 , 1957. A ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation