Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 20
Page iv
... pier and bridge details 30 14 General installation of 42- by 30 - foot radial gate for spillway 35 15 Spillway radial gate hoist assembly 36 16 Spillway gate structure -- River outlet and gate control arrangement 38 17 Assembly and list ...
... pier and bridge details 30 14 General installation of 42- by 30 - foot radial gate for spillway 35 15 Spillway radial gate hoist assembly 36 16 Spillway gate structure -- River outlet and gate control arrangement 38 17 Assembly and list ...
Page v
... pier with a crane and bucket 73 377 38 Laboratory technician preparing plastic tubing for installation of piezometer tip in the embankment Typical terminal well for 40 piezometer tips 77 78 39 Typical foundation settlement installation ...
... pier with a crane and bucket 73 377 38 Laboratory technician preparing plastic tubing for installation of piezometer tip in the embankment Typical terminal well for 40 piezometer tips 77 78 39 Typical foundation settlement installation ...
Page 23
... piers separate the gates and provide sup- port for a spillway bridge and gate control equipment . The spillway was designed for a discharge of 133,000 second - feet at reservoir water surface elevation 2785.0 , but model studies ...
... piers separate the gates and provide sup- port for a spillway bridge and gate control equipment . The spillway was designed for a discharge of 133,000 second - feet at reservoir water surface elevation 2785.0 , but model studies ...
Page 27
... piers spaced 50 feet over the gate structure . The four 8 - foot - wide piers extend to elevation 2785 , and contain stoplog slots and float wells with floats for use with the hydraulic gate operating system . To provide a minimum of ...
... piers spaced 50 feet over the gate structure . The four 8 - foot - wide piers extend to elevation 2785 , and contain stoplog slots and float wells with floats for use with the hydraulic gate operating system . To provide a minimum of ...
Page 29
... Pier- Crown El 2793.17 at supports-- -9 ° at crown El 2790.00 12 . cover Gale hoisting machinery not shown -Structural steel Crown El 2793 17 at supports- Expansion joint " El 2790.00 Contraction joint- ៩ ' · 6 " Fillet Roller E1 ...
... Pier- Crown El 2793.17 at supports-- -9 ° at crown El 2790.00 12 . cover Gale hoisting machinery not shown -Structural steel Crown El 2793 17 at supports- Expansion joint " El 2790.00 Contraction joint- ៩ ' · 6 " Fillet Roller E1 ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation