Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 8
Page iii
... mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting D. Gate Installations 58 . 59 . High - pressure gates Radial gates ( a ) Painting 255 75 75 75 CHAPTER VI --- TEST INSTALLATIONS 60 . Purpose 61 ...
... mixing Control Placement ( a ) Cold weather operations Curing Contraction joint grouting D. Gate Installations 58 . 59 . High - pressure gates Radial gates ( a ) Painting 255 75 75 75 CHAPTER VI --- TEST INSTALLATIONS 60 . Purpose 61 ...
Page v
... mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a ...
... mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing a spill- way floor slab 73 36 Placing concrete in a ...
Page 53
... mixing plants , and tests of earth materials during excava- tion and embankment placement . Laboratory forces supervised and assisted in installa- tion of technical apparatus on the dam embankment . Settlement and piezometer read- ings ...
... mixing plants , and tests of earth materials during excava- tion and embankment placement . Laboratory forces supervised and assisted in installa- tion of technical apparatus on the dam embankment . Settlement and piezometer read- ings ...
Page 59
... mixer trucks Fuel tank trailers Tractors Excavating machine Shop cranes Scrapers Motor grader Sheepsfoot rollers Smooth roller 21 1 3 11 1 11 1 1 1 7 Light plants several Vibrators 15 Rooter Farm disc Size or capacity 1/2 to 3/4 ton 1-1 ...
... mixer trucks Fuel tank trailers Tractors Excavating machine Shop cranes Scrapers Motor grader Sheepsfoot rollers Smooth roller 21 1 3 11 1 11 1 1 1 7 Light plants several Vibrators 15 Rooter Farm disc Size or capacity 1/2 to 3/4 ton 1-1 ...
Page 63
... mixing limitations of the loader , it was necessary to adjust the depth of cut and to subdivide the borrow area for excavation operations . This involved making several short turns and some deadheading of the equipment . ( b ) North ...
... mixing limitations of the loader , it was necessary to adjust the depth of cut and to subdivide the borrow area for excavation operations . This involved making several short turns and some deadheading of the equipment . ( b ) North ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation