Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 5
Page 34
The entire gate leaf is attached to two radial arms , one at each end , which carry
the hydraulic load on the gate to the trunnion pins and pedestals . Each gate arm
is equipped with a grease - lubricated bronze bushing . The base of the cast ...
The entire gate leaf is attached to two radial arms , one at each end , which carry
the hydraulic load on the gate to the trunnion pins and pedestals . Each gate arm
is equipped with a grease - lubricated bronze bushing . The base of the cast ...
Page 40
Constructed 1949-1953 United States. Bureau of Reclamation. cover the --- See
hydraulic hoist - sheet " ! Oil piping furnished by the Government + Provide 8
parts No. 19 for each by - pass required . See specifications for by - pass details
Air ...
Constructed 1949-1953 United States. Bureau of Reclamation. cover the --- See
hydraulic hoist - sheet " ! Oil piping furnished by the Government + Provide 8
parts No. 19 for each by - pass required . See specifications for by - pass details
Air ...
Page 50
4-0 * 14-0 " H.P. Slide gote -Air vent 8 * Gate by - pass 4-0 " , 4 ' - 0 " H.P. Slide
gate and hydraulic hoistOD -4 " Floor drain -Air vent pipe 0 to -- Ventilating pipe
PB -24 Metal shipladder 4 " Gutter18 " Steel ladderGate chamber Sto . 22 + 50.00
...
4-0 * 14-0 " H.P. Slide gote -Air vent 8 * Gate by - pass 4-0 " , 4 ' - 0 " H.P. Slide
gate and hydraulic hoistOD -4 " Floor drain -Air vent pipe 0 to -- Ventilating pipe
PB -24 Metal shipladder 4 " Gutter18 " Steel ladderGate chamber Sto . 22 + 50.00
...
Page 51
The gate in the control house is for regulating the flow of water through the outlet
works and is provided with a hydraulic gate hanger for holding the gate at any
required opening . Gate installations are shown on figure 23. With the gates 100
...
The gate in the control house is for regulating the flow of water through the outlet
works and is provided with a hydraulic gate hanger for holding the gate at any
required opening . Gate installations are shown on figure 23. With the gates 100
...
Page 52
An oil hydraulic system is provided for the control of high - pressure gates of the
river outlets and canal outlet works . ... The oil piping is connected to the
hydraulic gate hanger of the regulating gate in such a manner that the hanger
releases ...
An oil hydraulic system is provided for the control of high - pressure gates of the
river outlets and canal outlet works . ... The oil piping is connected to the
hydraulic gate hanger of the regulating gate in such a manner that the hanger
releases ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Contents
1 | |
2 | |
3 | |
4 | |
8 | |
10 | |
12 | |
15 | |
44 | |
45 | |
46 | |
48 | |
50 | |
53 | |
54 | |
60 | |
16 | |
18 | |
22 | |
24 | |
26 | |
28 | |
30 | |
33 | |
35 | |
36 | |
38 | |
39 | |
40 | |
41 | |
42 | |
61 | |
62 | |
64 | |
65 | |
68 | |
70 | |
72 | |
73 | |
77 | |
78 | |
79 | |
80 | |
83 | |
90 | |
101 | |
Other editions - View all
Common terms and phrases
abutment aggregate approximately assumed axis base basin blanket borrow area bottom bridge canal outlet capacity cement channel coating compact completed concrete conduit consisted construction contract contractor control house cost cover Crest cubic cutoff trench designed determining discharge downstream drain drawing Electric elevation embankment excavation extend feet Figure flood floor forms foundation Furnishing gate chamber gote gravel Grout head Highway hoist holes horizontal hydraulic inches indicated inlet installed joints layer length Limits loads located material maximum metal obtained opening operation pipe placed PLAN plate points pounds pressure protective pump railroad reinforcement relocation reservoir water surface riprap River outlet Rolled sand SANO SECTION settlement shale Sheet shown side SILT slope specifications spillway station steel stilling storage stresses structure Sump pump supports tests tion Trenton Dam trucks Unit upstream valve vertical walls weight yards