Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 23
Page iv
... hoist assembly 36 16 Spillway gate structure -- River outlet and gate control arrangement 38 17 Assembly and list of parts for 6- by 7-1 / 2 - foot high- pressure gate 40 18 Canal outlet works -- Plan and sections 42 19 Canal outlet ...
... hoist assembly 36 16 Spillway gate structure -- River outlet and gate control arrangement 38 17 Assembly and list of parts for 6- by 7-1 / 2 - foot high- pressure gate 40 18 Canal outlet works -- Plan and sections 42 19 Canal outlet ...
Page 27
... hoisting machinery . River outlets are located at the base of the intermediate piers and pass through the crest structure . To keep hydraulic losses low , these outlets have bellmouth entrances . The outlet gate chambers are located ...
... hoisting machinery . River outlets are located at the base of the intermediate piers and pass through the crest structure . To keep hydraulic losses low , these outlets have bellmouth entrances . The outlet gate chambers are located ...
Page 29
... hoisting machinery not shown -Structural steel Crown El 2793 17 at supports- Expansion joint " El 2790.00 Contraction joint- ៩ ' · 6 " Fillet Roller E1.2787.52 El 2785 00 Float well Bearing block- 9 at crown -6 " Fillet --Painted joint ...
... hoisting machinery not shown -Structural steel Crown El 2793 17 at supports- Expansion joint " El 2790.00 Contraction joint- ៩ ' · 6 " Fillet Roller E1.2787.52 El 2785 00 Float well Bearing block- 9 at crown -6 " Fillet --Painted joint ...
Page 30
... hoisting machinery Trashrack structure . Left intermediate pier -6 Deep keyways PLAN OF LEFT END PIER ( RIGHT END PIER OPPOSITE HAND EXCEPT WHERE NOTFD ) Protective fence- El 2785.00- Sta 29.87,44 2 " Crown E1.2793.17 at supports . ~ 26 ...
... hoisting machinery Trashrack structure . Left intermediate pier -6 Deep keyways PLAN OF LEFT END PIER ( RIGHT END PIER OPPOSITE HAND EXCEPT WHERE NOTFD ) Protective fence- El 2785.00- Sta 29.87,44 2 " Crown E1.2793.17 at supports . ~ 26 ...
Page 31
... gate structure -- Crest , pier and bridge details . ( Sheet 2 of 2. ) From drawing 328 - D - 948 . -12 " -Gate hoisting machinery not shown 30 54 18 2720.66 TABLE OF CREST CO - ORDINATES 7 - foot - wide by 25 - foot -. 31 14.
... gate structure -- Crest , pier and bridge details . ( Sheet 2 of 2. ) From drawing 328 - D - 948 . -12 " -Gate hoisting machinery not shown 30 54 18 2720.66 TABLE OF CREST CO - ORDINATES 7 - foot - wide by 25 - foot -. 31 14.
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation