Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 1-5 of 40
Page
... foot base width with 1-1 / 2 to 1 side slopes , length about 6 , 760 feet Auxiliary cutoff trench : 50 - foot base width with 1-1 / 2 to 1 side slopes , length about 570 feet Spillway Type : Concrete overflow chute type with stilling ...
... foot base width with 1-1 / 2 to 1 side slopes , length about 6 , 760 feet Auxiliary cutoff trench : 50 - foot base width with 1-1 / 2 to 1 side slopes , length about 570 feet Spillway Type : Concrete overflow chute type with stilling ...
Page i
... foot radial gates ( a ) Design stresses Radial gate controls ( a ) Design stresses Ice prevention system Spillway bridge River outlet trashracks High - pressure gates 27 27 32 32 32 33 33 34 34 34 34 wwwww . 37 37 37 39 39 D. Canal ...
... foot radial gates ( a ) Design stresses Radial gate controls ( a ) Design stresses Ice prevention system Spillway bridge River outlet trashracks High - pressure gates 27 27 32 32 32 33 33 34 34 34 34 wwwww . 37 37 37 39 39 D. Canal ...
Page iv
... foot radial gate for spillway 35 15 Spillway radial gate hoist assembly 36 16 Spillway gate structure -- River outlet and gate control arrangement 38 17 Assembly and list of parts for 6- by 7-1 / 2 - foot high- pressure gate 40 18 Canal ...
... foot radial gate for spillway 35 15 Spillway radial gate hoist assembly 36 16 Spillway gate structure -- River outlet and gate control arrangement 38 17 Assembly and list of parts for 6- by 7-1 / 2 - foot high- pressure gate 40 18 Canal ...
Page v
... foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing ...
... foot circular conduit being assembled 68 View from top of mixing plant showing aggregate un- loading hopper , aggregate stockpiles , and conveyor system 70 34 Typical concrete mix data 72 35 Workmen using a vibrating screed in finishing ...
Page 7
... foot test pits were excavated . Extensive lab- oratory tests were made for determining physical properties of the undisturbed samples of loess , sands , and shale obtained at various depths during the exploration operations . Logs and ...
... foot test pits were excavated . Extensive lab- oratory tests were made for determining physical properties of the undisturbed samples of loess , sands , and shale obtained at various depths during the exploration operations . Logs and ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation